My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1985-1476
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1980's
>
1985
>
O-1985-1476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:43 PM
Creation date
7/24/2006 10:22:21 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
10/28/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />WARNING TO BIDDERS <br /> <br />The signatory of this Contractor's Statement guarantees, as <br />evidenced by the sworn affidavit required herein, the truth and <br />accuracy of all .statements and of all answers to the <br />interrogatories hereinafter made. <br /> <br />Before a contractor shall be considered eligible to bid on <br />owner's work of estimated construction cost of greater <br />than , he must have filed a satisfactory' contractor's <br />statement on this form, with the City of La Porte, Texas. This <br />statement shall be made as of the last day of any month, and <br />must be on file in the offices of the City of La Porte, at least <br />fifteen (15) days prior to the date bids are to be opened, if a <br />contractor is to be eligible to bid. <br /> <br />A new Contractor's Statement shall be made annually. If a <br />contractor has a satisfactory Contractor's Statement on file, he <br />will be eligible to bid for a period of twelve (12) months from <br />the date of the Contractor's Statement; however, City 'of La <br />Porte reserves the right to require a new contractor's statement <br />at any time. A contractor will be granted a three-month grace <br />period to prepare and submit a new Contractor's Statement, <br />provided he notifies the construction manager in writing, prior <br />to the date his Contractor's Statement expires, of his intention <br />to requalify. <br /> <br />It is clearly understood that if discrepancies are found in <br />this Contractor's Statement, the same will be considered <br />unsatisfactory, and the contractor will be ineligible to bid <br />until such discrepancies are satisfactorily explained to the <br />construction project manager. <br /> <br />In compiling the Contractor's Statement, all items must be <br />filled in and all schedules must be completed in detail. If <br />separate schedules are used, they must be specifically <br />identified as to which schedule in the Contractor's Statement <br />they support. FAILURE TO COMPLETE ALL ITEMS AND ALL SCHEDULES <br />IN DETAIL WILL DISQUALIFY THE CONTRACTOR, AND THE CONTRACTOR <br />WILL BE INELIGIBLE TO BID UNTIL A PROPERLY COMPLETED <br />CONTRACTOR'S STATEMENT HAS BEEN FILED WITH the City of La <br />Porte. If there is nothing to report in certain items or <br />schedules, then make the notation "None". <br /> <br />The amount as shown for each item must be actual, as taken <br />from company's books and verified, and must not be "approximate" <br />amounts. <br /> <br />A CONTRACTOR SUBMITTING A BID ON OWNER'S WORK SHALL ENTER A <br />BID WHICH STRICTLY CONFORMS TO THE PLANS AND SPECIFICATIONS OF <br />THE PROJECT AS ISSUED BY THE PROJECT'S ENGINEER(S). <br /> <br />CONTRACTORS ENTERING BIDS ON OWNER'S WORK SHALL HQI <br />SUBCONTRACT MORE THAN 50% OF WORK ON THE PROJECT, WITHOUT FIRST <br />OBTAINING THE EXPRESS WRITTEN CONSENT OF THE CITY OF LA PORTE. <br /> <br />All contractors (or a representative of the contractor) <br />desiring to bid on owner's work must attend a pre-bid <br />conference; otherwise, their bid will be returned unopened. No <br />plans and specifications shall be issued by the engineer(s) <br />after the pre-bid conference. <br />
The URL can be used to link to this page
Your browser does not support the video tag.