My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1995-2041
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1995
>
O-1995-2041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:56 PM
Creation date
7/24/2006 2:15:27 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />to Owner's said property. Owner and City have entered into a separate "Water Service Agreement" of even date <br /> <br />herewith, which provides for limited water service to Owner. <br /> <br />(3) :City hereby agrees to an extension of its utility main(s) to said property commencing at the <br />nearest existing utility main(s) of sufficient size and capacity. Thence alongJthru City of La Porte rights-of-way <br /> <br />and/or easements to said Owner's property. Provided, however, that should City not possess all necessary rights- <br /> <br />of-way, easements, licenses, and/or permits, Owner shall be solely responsible for obtaining said additional <br /> <br />rights-of-way, easements, licenses, and/or permits at no cost to City. All permits and approvals required by <br /> <br />entities with juriSdiction shall be secured prior to construction. <br /> <br />(4) Owner agrees to pay all costs related to the construction and installation of said utility mains, <br /> <br />including necessary appurtenances in conformance with City's standards and specifications for said utility mains. <br /> <br />Owner further agrees to pay all engineering fees for swvey, design, contract documents, bidding. construction <br /> <br />staking, construction inspection, and preparation of record drawings. Anyaedit, funding or other participation <br /> <br />byCityshallbedesaibedbeloW; (1) Difference in cost of materials for installation of 12 inch <br />waterline vs. 8 inch waterline for 265 feet of pipe installed west to east along north <br />side of Fairmont Parkway to a locat~on aooroximatelv 45 feet west of the center line of <br />Bay Park Road. jab Package 155104 Drawing H5104CV1 . . <br /> <br />(2) Difference in cost of materials for installation of 12 inch "T" fitting vs. 8 inch "L" <br />at branching location of 12 inch waterline installed along north side of Fairmont Pa'rkway <br />Job Package 155104 Drawing H5104CV1 . <br /> <br />(3) Cost of materials for installation of one 20 foot joint of 12 inch pipe with 1 inch <br />blnr..k valvp. and plug,'cnnnElcting to 12 inch "T" fitting and Elxtending eastward along <br />Fairmont Parkway. Job Package 155104 Drawing H5104CV1 <br />(5) Subject to the provisions of this agreement, City hereby agrees to the construction and <br /> <br />installation of said utility main(s) according to the plans, specifications, and contract documents to be prepared <br /> <br />by the Owner's engineer and approved by the City. The contract documents shall include a provision for a one <br /> <br />(1) year warranty from defects in materials and workmanship. The documents will also provide a "Notice" to <br /> <br />Contractor that the City of La Porte will perform the daily construction inspection to insure compliance with <br /> <br />plans and specifications. Owner agrees that City will Dot be responsible for issuing or approving payments to <br /> <br />the Contractor. It is agreed and understood that Owner is responsible for paying for any unforeseen aists/or <br /> <br />cost overruns in the project that result from circumstances beyond the control of the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.