Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Owner's said propeny. Owner and City have entered into a separate "Water Service Agreement" of even date <br />herewith, which provides for limited water service to Owner. <br />(3) City hereby agrees to an extension of its utility main(s) to said property commencing at the nearest <br />existing utility main(s) of sufficient size and capacity. Thence along/thru City of La Porte rights-of-way andlor <br />easements to said Owner's property. Provided, however, that should City not possess all necessary rights-of-way, <br />easements, licenses, and/or permits, Owner shall be solely responsible for obtaining said additional rights-of-way, <br />easements, licenses, and/or permits at no cost to City. All permits and approvals required by entities with <br />jurisdiction shall be secured prior to construction. <br />(4) Owner agrees to pay all costs related to the construction and installation of said utility mains, <br />including necessary appurtenances in conformance with City's standards and specifications for said utility mains. <br />Owner further agrees to pay all engineering fees for survey, design, contract documents, bidding, construction <br />staking, constrUction inspection, and preparation of record drawings. <br />(5) Subject to the provisions of this agreement, City hereby agrees to the construction and installation <br />of said utility main(s) according to the plans, specifications, and contract documents to be prepared by.the Owner's <br />engineer and approved by the City. The contract documents shall include a provision for a one (1) year warranty <br />from defects in materials and workmanship. The documents will also provide a "Notice" to Contractor that the City <br />of La Porte will perform the daily construction inspection to insure compliance with plans and specifications. <br />Owner agrees that City will not be responsible for issuing or approving payments to the Contractor. It is agreed <br />and understood that Owner is responsible for paying for any unforeseen costs/or cost overruns in the project that <br />result from circumstances beyond the control of the City. <br />(6) City shall have the right to approve the Engineer and the Contractor selected by Owner. Upon <br />completion and approval of plans, specifications, and contract documents, the City shall authorize the Owner to <br />secure bids from qualified underground utility contractors. <br />(7) Owner agrees that upon completion and acceptance by City, City will assume ownership and <br />maintenance of the utility main and as such shall have full control over future extensions and connections thereto. <br />(8) Owner and City have entered into a separate "Water Service Agreement" which provides terms <br />and conditions for limited water service to Owner and as lillCh, Owner is not responsible for payment of City's <br />