Laserfiche WebLink
<br />Total on-sil' <br /> <br />110 e <br /> <br />IV. <br />CITY has determined that adequate facilities are available to CITY to furnish potable <br />water to COMPANY based on the following terms and conditions, to-wit: <br />(A) Payment to CITY of a one time administrative connection charge of $11.000. <br />COMPANY shall also be required to pay an amount equal to one-half (1h) of <br />their frontage length adjacent to the utility main, times the average cost per foot <br />for the original construction of the line. The average cost per foot shall be <br />established by dividing the total final construction cost, less any CITY <br />participation, by the total length of the utility main constructed. <br />(B) The average daily demand is established at 5.500 gallons per day. <br />This number is based on an average of fifty (50) gallons per employee per day <br />established by CITY. <br />(C) The average monthly demand of 167.750 gallons is established by <br />multiplying the average daily demand by a factor of 30.5, which shall be used to <br />facilitate service billings. <br />(D) The cost of water up to the average monthly demand of 167.750 gallons <br />shall be one hundred fifty percent (150%) of the CITY'S current rate as <br />established from time to time for commercial customers inside its corporate <br />limits. <br />(E) The cost of water for amounts used in excess of the established average monthly <br />demand shall be two hundred percent (200%) of the CITY'S current rate as <br />established from time to time for commercial customers inside its corporate <br />limits. <br />(F) Nothing contained in this Agreement shall obligate CITY to furnish more than the <br />average monthly demand of 167.750 gallons. Repeated consumptions <br />