Laserfiche WebLink
<br />EXHIBIT C2 <br /> <br /> Raw Project Original Original New New <br /> Original Cost (a) Cost (a) Allocation %(a) Allocation $ (a) Allocation % Allocation $ Increased $ <br />$ 14,367,830 $ 14,367,830 801250 $ 4,597.706 1261250 $ 7,241.386 $ 2.643,681 <br /> 21,261,056 7,492,883 2251225 7,492.883 2251225 7492.883 - <br />$ 35.828,886 $ 21,860,713 $ 12,090,589 $ 14.734.268 $ 2 643 681 <br />I . <br /> <br />CALCULATION OF UNRECOVERED ORIGINAL CAPITAL COSTS <br /> <br /> . - -.--- . .... -.____.....vw. I <br /> SEWPP Original Original New New <br /> Original Cost Cost (73%) Allocation % Allocation $ Allocation % Allocation $ Increased $ <br />$ 6.675,192 $ 4.872.890 801750 $ 519,n5 1201750 $ 719,662 $ 259,88 <br /> 1.149,372 - 0 - 0 <br /> 606,238 442.554 801750 47,206 1201750 70.809 23.603 <br /> 145,660 106.332 801750 11.342 1201750 17,013 . 5.671 <br /> 6,285.148 4,588.157 80/160 2,294,078 801160 2.294,078 - <br /> 2.692,423 1.965,469 80180 1,965.469 80180 1,965.469 - <br /> - <br /> 728,232 531.609 80180 . 531,609 80180 - 531,609 - <br /> 80.393,507 58.687,260 80/80 58,687,260 '80180 58,687.260 - <br /> 1.695,900 1.238.007 BOn5O 132.054 1201720 206,335 74.280 <br /> 6.102,064 4.454.507 80180 4.454,507 80180 4.454.507 - <br /> 25,150 25,150 80180 25,150 80180 25,150 - <br />$ 106.498,884 $ 76.911 934 $ 68,668.450 $ 69,031.892 $ 363.442 <br />I .. . - <br /> <br />Raw Water Supply: <br />Pipeline CWA - 96" Pipeline <br />Pump Station. CWA <br /> <br />Treatment Plant (SEWPP): <br />Land Acquisition <br />Site Cleanup <br />Engineering: <br />Preliminary <br />Siting Study <br />Final Design -160 mgd <br />Final Design - ea mgd <br />Construction <br />Construction <br />138 KV Electric <br />Construction Mol <br />Audit Fees <br /> <br />Total Raw Water Supply and SEWPP <br /> <br />3,007.123 <br /> <br />$ <br /> <br />83,768,161 <br /> <br />$ <br /> <br />80.759,039 <br /> <br />$ <br /> <br />98,m.647 <br /> <br />1995. <br /> <br />$ <br /> <br />Source: KPMG Audit of SEWPP Construction Costs as of November 30, <br />The unrecovered costs after this expanaIon wiD be $15.006.486. <br /> <br />142.127.no <br /> <br />$ <br /> <br />(a) <br />(b) <br /> <br />- <br /> <br />'- <br />