My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2383
LaPorte
>
.Ordinances
>
2000's
>
2000
>
O-2000-2383
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:04 PM
Creation date
7/25/2006 1:34:20 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/21/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />EXHIBIT E <br /> <br />CALCULATION OF ANNUAL BUDGET <br /> <br />The Operation and Maintenance budgeted O&M Expenses, as currently calculated, consist of"the <br />following: <br /> <br />(Item C in formula given in Section 4.3): <br />.1 Total City of Houston Non-Contract Plant Expenditures (including Salary and Benefits, <br />Telephone, Electric, Insurance, Water Production Personnel, Meter Reading and Billing, and <br />Other Related Direct Expenditures). <br /> <br />.2 Total Contracted Water Services (includiIig any operating contract settlements, legal <br />expenses and contractor claims). <br /> <br />.3 Overhead Costs (based on a proportionate share of Management & Support, Finance and <br />Administration, and Indirect Costs) with a fixed allocation of9% of Total Contracted Water <br />Services per item .2 above. <br /> <br />(Item D in formula given in Section 4.3): <br />The Operation and Maintenance expenses budgeted by Houston for TRA and CW A as well as <br />the respective debt service as itemized below <br /> <br />.4 TRA Debt Service <br />.5 CWA Debt Service for all Series Bonds, except 1987, 1991, 1995. <br />.6 CW A Debt Service, Series 1987 and 1991 times 17.525 %. <br />.7 Future City Debt Service in support of Raw Water Storage and Transmission Facilities <br /> <br />(Item F in formula given in Section 4.3): <br />The..CW A Debt Service expense (allocated 93.11 % to the Plant) for the 96 inch raw water <br />pipeline leading to the Plant, times the then-current portion of the pipeline used (currently 126 <br />MGD/240 MGD). <br /> <br />.8 The formula for calculating the estimated budgeted cost per thousand gallons is as follows: <br /> <br />(CIB) X (1 +H) + (DIE) X (1+H) = estimated cost per 1,00.0 galllons, with Band E described as <br />follows: <br /> <br />B = the total amount of water estimated to be produced by the Plant during the given year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.