Laserfiche WebLink
<br />---.....---- <br />: L--~;:"'" '\. r <br />I ". ~,-.... v (' . <br /> <br />i I' ',.,-' c.' jl / , <br />-" ,---,,",.. - <br />: -----._-__---...4 <br />L-.__ <br /> <br />e <br /> <br />e <br /> <br />. Preparing documents for alternate bids requested by the City or documents for out of <br />sequence work, <br /> <br />. Preparing to serve or serving as a consultant or witness for the City in any litigation, public <br />hearing or other legal or administrative proceeding involving the Project. <br /> <br />. Additional or extended services during construction made necessary by (1) work damaged <br />by fire or other cause during construction, (2) a significant amount of defective or neglected <br />work ofContractor(s), (3) prolongation of the construction contract time, (4) acceleration of <br />the progress schedule involving services beyond normal working hours and (5) default of <br />contractor <br /> <br />CMI will endeavor to apprise the City of any potential additional or extended services which <br />may result from the above listed 5 items, prior to CMl's expenditure oftime on such services, <br />As previously noted, any such extended or additional services shall only be performed when <br />directed by the City to CMI. <br /> <br />. Additional services not otherwise provided for in the scope of services. <br /> <br />FEE <br /> <br />Survev Services <br /> <br />Claunch & Miller, Inc.'s fee for the field survey services is the lump sum amount of: <br /> <br />$7,700,00 <br /> <br />Geotechnical Services <br /> <br />Claunch & Miller, Inc.'s fee for the geotechnical services is the lump sum amount of: $1,320.00 <br />Preliminary Eneineerine Phase <br /> <br />Claunch & Miller, Inc.'s fee for the preliminary engineering phase is the lump sum amount of: <br />$7,200,00 <br /> <br />Final Desien Phase <br /> <br />Claunch and Miller, Inc. will perform the Final Design Phase for the Lump Sum amount of: <br />$21,550,00 <br /> <br />Page 5 of6 <br />