My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2351
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:03 PM
Creation date
7/25/2006 2:19:09 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/9/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />· Preparing documents for alternate bids requested by the City or documents for out of <br />sequence work. <br /> <br />· Preparing to serve or serving as a consultant or witness for the City in litigation, <br />public hearing or other legal or administrative proceeding involving the Project. <br /> <br />· Additional or extended services during construction made necessary by (1) work <br />damaged by fire or other cause during construction, (2) a significant amount of <br />defective or neglected work of Contractor(s), (3) prolongation of the construction <br />contract time, (4) acceleration of the progress schedule involving services beyond <br />normal working hours and (5) default of contractor. <br /> <br />Engineer will endeavor to apprise the City of any potential additional or extended <br />services which may result from the above listed 5 items, prior to Engineer's <br />expenditure of time on such services. As previously noted, any such extended or <br />additional services shall only be performed when directed by the City to Engineer. <br /> <br />· Additional Services not otherwise provided for in the scope of services. <br /> <br />COMPENSATION <br /> <br />Survey and Desien Services <br /> <br />Engineer will perform the Survey, Preliminary Design, Final Design, Bidding, and <br />Construction Phase for an amount not to exceed $25,933 based on actual time and <br />materials. <br /> <br />Additional Services <br /> <br />Additional services beyond those described in the Scope of Services will be invoiced on <br />the basis of direct labor cost times a factor of 2.99 and direct cost plus 10%. <br /> <br />Payment <br /> <br />Engineer will submit monthly progress invoices for all engineering work completed to <br />invoice date. The invoices would be based on actual time and materials expended on the <br />project. <br /> <br />TIME OF COMPLETION <br /> <br />Engineer will complete the Final Design and have documents suitable for bidding within <br />65 calendar days after receiving authorization to proceed from the Owner. <br /> <br />Attachment A - 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.