My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2351
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:03 PM
Creation date
7/25/2006 2:19:09 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
8/9/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />return all original documents to Owner upon completion of the Project, but <br /> <br />reserves the right to make and keep reproducible copies of all such <br /> <br />material. <br /> <br />3. Access to Facilities - Owner will provide access for the Engineer to enter <br /> <br /> <br />the property and facilities of Owner, as necessary for Engineer to perform <br /> <br /> <br />services as required under the Project. <br /> <br /> <br />4. Instruments of Service - All documents prepared in accordance with this <br /> <br /> <br />contract including exhibits, field notes, laboratory data, original drawings, <br /> <br /> <br />and specifications are the property of the Owner. The Engineer is given <br /> <br /> <br />the right to use any of this data in connection with future engineering <br /> <br /> <br />projects. The Engineer may retain copies or reproducibles of any <br /> <br /> <br />information prepared for this Project. <br /> <br /> <br />5. Determination of Fees - The fees for the scope of services as stated in <br /> <br /> <br />Attachment "A" provided by Engineer under this agreement will be based <br /> <br /> <br />on actual time and materials not to exceed $25,933. <br /> <br /> <br />6. Payment and Fee Schedule - The Engineer will submit a monthly invoice <br /> <br />for services rendered. The invoice will be based upon actual time and <br /> <br /> <br />materials expended on the project at the time of the invoice. An estimated <br />breakdown is as follows: <br /> <br />Survey and Preliminary Design: <br />Final Design and Bidding <br />Construction Administration <br />Total <br /> <br />$ 5,668.00 <br /> <br />$18,837.00 <br /> <br />$ 1,428.00 <br /> <br />$25.933.00 <br /> <br />Agreement - 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.