Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />1.5 Bidding or Negotiation Phase <br /> <br />After written authorization to proceed with the Bidding <br />or negotiation Phase, ARCHITECT shall: <br /> <br />1 .5 .1 Following the OWNER's approval of the Construction Documents <br />and of the latest preliminary estimate of Construction Cost the <br />ARCHITECT shall assist OWNER in advertising for and obtaining bids <br />or negotiating proposals for the prime contract for construction, <br />materials, equipment and servicesj and, where applicable, maintain <br />a record of prospective bidders to whom Bidding Documents have been <br />issued, attend pre-bid conferences and receive and process deposits <br />for Bidding Documents. <br /> <br />1.5.2Issue addenda as appropriate to interpret, clarify or expand <br />the Bidding Documents. <br /> <br />1.5 . 3 Consul t with and advise OWNER as to the acceptabil i ty of <br />subcontractors, suppliers and other persons and organizations <br />proposed by the prime contractor (herein called "Contractor") for <br />those portions of the work as to which such acceptability is <br />required by the Bidding Documents. <br /> <br />1.5.4Consult with OWNER concerning and determine the acceptability <br />of substitute materials and equipment proposed by Contractor when <br />substitution prior to the award of contracts is allowed by the <br />Bidding Documents. <br /> <br />1.5.5Attend the bid opening, prepare bid tabulation sheets and <br />assist OWNER in evaluating bids or proposals and in assembling and <br />awarding the contract(s} for construction, materials, equipment and <br />services. <br /> <br />The duties and responsibilities of ARCHITECT during the <br />Bidding or Negotiation Phase are amended and supplemented as <br />indicated in paragraph 5 of Exhibit A "Further Description of Basic <br />Services and Related Matters". <br /> <br />1.6 Construction Phase <br /> <br />After written authorization to proceed with the <br />Construction Phasej ARCHITECT shall: <br /> <br />1.6.1General Administration of Construction Contract <br /> <br />ARCHITECT shall consult with and advise OWNER and act as <br />OWNER's representati ve as provided in the Standard General <br />Conditions of the Construction Contract (as approved by OWNER per <br />paragraph 1.4.4) . <br /> <br />The extent and limitations of the duties, responsibilities and <br />authority of ARCHITECT as assigned in said Standard General <br /> <br />1-4 <br />