My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2346
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 2:25:21 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
7/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />Documents, and have this material delivered to <br />ARCHITECT for review and forwarding to OWNER prior <br />to final payment for the Work. <br /> <br />12. Completion: <br />a. Before ARCHITECT issues a Certificate of <br />Substantial Completion, submit to CONTRACTOR a <br />list of observed items requiring completion or <br />correction. <br /> <br />b. Conduct final inspection in the company of <br />ARCHITECT, OWNER, and CONTRACTOR and prepare a <br />final list of items to be completed or <br />corrected. <br /> <br />c. <br /> <br />Observe that all <br />completed or <br />recommendations <br />acceptance. <br /> <br />items on final list have been <br />corrected and make <br />to ARCHITECT concerning <br /> <br />C. Limitations of Authority <br /> <br />Resident Project Representative: <br /> <br />1 . Shall not authorize any deviation from the Contract <br />Documents or substitution of materials or equipment, <br />unless authorized by ARCHITECT. <br /> <br />2. Shall not exceed limitations of ARCHITECT's authority as <br />set forth in the Agreement or the Contract Documents. <br /> <br />3. Shall not undertake any of the responsibilities of <br />CONTRACTOR, subcontractors or CONTRACTOR's <br />superintendent. <br /> <br />4. Shall not advise on, issue directions relative to or <br />assume control over any aspect of the means, methods, <br />techniques, sequences or procedures of construction <br />unless such advice or directions are specifically <br />required by the Contract Documents. <br /> <br />5. Shall not advise on, issue directions regarding, or <br />assume control over safety precautions and programs in <br />connection with the Work. <br /> <br />6. Shall not accept Shop Drawing or sample submittals from <br />anyone other then CONTRACTOR. <br /> <br />B-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.