Laserfiche WebLink
<br />~ <br />~ <br /> <br />e e <br />CLAUNCH & MILLER, IN C. <br />Engineering Consultants <br /> <br />July 6. 1999 <br /> <br />Mr. Steve Gillene <br />Director oiPublic Works <br />City of La Pone <br />P.O. Box 1115 <br />La Pone. Texas i7571-1115 <br /> <br />Re: Engineering Services for Diesel Au.xiliary Lnit at Water Well ~o. 5 <br />C\tll Job No. 99035 <br /> <br />Dear Mr. Gillene: <br /> <br />On July 1. 1999, bids were received on the above referenced project at the City Hall of La Pone at <br />2:00 p.m. Bids were opened and read in public. Three (3) bids were received on the project. <br /> <br />All bids were tabulated and reviewed. The following is a summary of our bid evaluation: <br /> <br />Bidder <br />Lowest: <br />Second: <br />Third: <br /> <br />Weissinger \Vater Well, Inc. <br />Holloway Company, Inc. <br />MS Beck Construction Co., Inc. <br /> <br />Bid Amount <br />561,150.00 <br />567,000.00 <br />584,709.00 <br /> <br />The djfference between the low bidder and the second low bidder was 55,850.00. A copy of the bid <br />tabulation is anached. <br /> <br />We have successfully completed projects with Weissinger Water Well, Inc. In view of this, <br />Weissinger Water Well, Inc. appears to be a responsible firm that is capable of performing the <br />specified work in a satisfactory manner. For this reason, we recommend that the City of La Porte <br />award the Waterline Improvements Project to Weissinger Water Well, Inc. for the amount of <br />561,150.00. <br /> <br />Sincerely. <br /> <br />CLAUNCH & MILLER, IKC. <br /> <br />~r.~/ <br /> <br />?L. <br /> <br />James E. Thompson, P.E. <br />Senior Project Manager <br /> <br />JET/sc <br /> <br />3701 Kirby Drive, Suite 860. Houston, Texas 77098. (713) 524-7113 <br />