My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2338
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 2:36:33 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
6/28/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />2 <br /> <br />pay all engineering fees for survey, design, contract documents, bidding, construction srakiDg, <br />coDStruction inspection, and preparntion and submittal of As-Built consttuction drawings. <br />S. Subject to the provisions of this agreement, City hereby agrees to the construction and iDsIaDation of <br />said utility main(s) according to the plans and specifications referenced in Section 1 hereof and <br />contract docmnents to be prepared by the Ownets engineer and approved by the City. The contract <br />documents sball include a provision for a one (1) year wammly from defects in materials and <br />woricman!lh~. The documents will also provide a "Notice" to Contractor that the City of La Porte will <br />perform daily construction inspection to insure compliance with plans and specifications. Owner <br />agrees that City will not be responsible for issuing or approving payments to the Contractor. It is <br />agreed and UDderstood that Owner is respoIISlDle for paying for any UDforeseen costs or cost ovemms <br />in the project that result from circumstances beyond the control of the City. <br />6. City sball have the right to approve the Engineer and the Contractor selected by Owner. Upon <br />completion and approval of plans, specifications, and contlact documents, the City shall authorize the <br />Owner to secure bids from qualified underground utility CODIJactors. <br />7. Owner agrees that upon completion and acceptance by City, City will assume ownership and <br />maintenance of the utility main(s) and as such shall have full control over future extensions and <br />connections thereto. <br />8. For the purposes of reimbursement, as provided for in paragraph 9, Owner agrees to supply City with a <br />statement of fmal construction costs. Owner and City agree to use the final construction cost to <br />develop an average cost per foot. Said average cost per foot shall be calculated by determining the <br />final construction cost eligxDle for reimbursement divided by the total length of utility main eligxole for <br />reimbursement as defined by E.'Chibit "A". <br />9. In the event that other owners of property abutting the utility mains e."dended by Owner under this <br />contract, as shown on the plat attached hereto as Exhibit .. A" and inCOIpOIated by reference herein, <br />shall utilize the extended utility main(s) constructed under this agreement by making connection <br />thereto under a permit from City within a period of then (10) years from and after the date City has <br />accepted the construction of said facilities by the contractor, City agrees to collect from said property <br />owners, an amount equal to their linear foot of frootage abutting the utility main times the average cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.