Laserfiche WebLink
<br />e <br /> <br />. <br /> <br />SECTION 5 - PAYMENTS TO ARCHITECT <br /> <br />5.1 OWNER has established an initial construction cost limit of one million four <br />hundred thirty-fIVe thousand fifty-three dollars ($ 1,435,053.00) available for construction. <br /> <br />5.1.1 For Basic Services. OWNER shall pay ARCHITECT for Basic Services rendered <br />under Section 1 (as amended and supplemented by Exhibit A "Further Description of <br />Basic Services and Related Matters'1 as follows: <br /> <br />5.1.1.1 A lump sum in the amount of one hundred fifteen thousand dollars {$ 115,000). <br />Progress payments for Basic Services in each phase shall total the following percentages <br />of the total basic compensation payable: <br /> <br />Schematic Design Phase <br />Design Development Phase <br />Construction Documents Phase <br />Bidding or Negotiation Phase <br />Construction Phase <br />Operational Phase <br /> <br />fifteen percent <br />twenty percent <br />thirty-five percent <br />five percent <br />twenty percent <br />five percent <br /> <br />( 15%) <br />( 20%) <br />( 35%) <br />( 5%) <br />( 20%) <br />( 5%) <br /> <br />Total Compensation for Basic Services <br /> <br />$115,000 <br /> <br />5.1.1.2Should the ARCHITECTs Preliminary Construction Cost Estimate or the lowest <br />bona fide proposal or bid amount exceed the amount in section 5.1 as available for <br />construction, the ARCHITECT may be required at the discretion of the OWNER to amend <br />the design to bring the construction cost estimate or bid amount within the amount <br />specified without additional cost to the OWNER. <br /> <br />5.1.1.31f the work is not carried on after Construction Document Phase and drawings, <br />specifications and Construction Documents are completed and approved, the OWNER will <br />pay the ARCHITECT through the Construction Documents Phase in accordance with <br />Section 5.1.1 above; or, if the bids have been received, the OWNER will pay the <br />ARCHITECT seventy-five percent ( 75%) of the fee as specified in Section 5.1.1.1. <br /> <br />5.1.1.4The ARCHITECTS responsibility to provide Basic Services for the Construction <br />Phase under this Agreement commences with the award of the Contract for Construction <br />and terminates sixty (60) days after a) the actual date of Substantial Completion. Services <br />provided after this date shall be considered Additional Services with the compensation due <br />in accordance with Subparagraph 5.1.2 of this Agreement and shall require OWNER'S <br />written authorization. <br /> <br />5.1.2 For Additional Services. OWNER shall pay ARCHITECT for Additional Services <br />rendered under Section 2 as follows: <br /> <br />On an hourly basis, using Standard Office Billing Rates and Categories <br />identified in paragraph 5.5 of this Agreemen~ or as mutually agreed between <br /> <br />5-1 <br />