My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2322
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 2:55:31 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. <br /> <br />EXHIBIT B <br />A USTlNG OF THE DUTIES, RESPONSIBIUTlES AND <br />UMITATlONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE <br />EXHIBIT B TO AGREEMENT BElWEEN OWNER AND ARCHITECT <br />FOR PROFESSIONAL SERVICES, dated <br />April 26, 1999 <br /> <br />This is an Exhibit attached to, made a part of and incorporated by reference with the <br />Agreement made on April 26, 1999, between The City of La Porte, Texas (OWNER) and <br />Robert W. McKinney AlA (ARCHITECT) providing for professional services. <br /> <br />ARCHITECT or OWNER may furnish a Resident Project Representative (RPR), <br />assistants and other field staff to assist ARCHITECT in observing perfonnance of the work <br />of Contractor. <br />Through more extensive on-site observations of the work in progress and field <br />checks of materials and equipment by the RPR and assistants, ARCHITECT shall <br />endeavor to provide further protection for OWNER against defects and deficiencies in the <br />work of CONTRACTOR; but, the furnishing of such services will not make ARCHITECT <br />responsible for or give ARCHITECT control over construction means. methods, <br />techniques. sequences or procedures or for safety precautions or programs, or <br />responsibility for CONTRACTOR's failure to perform the Work in accordance with the <br />Contract Documents and in particular the specific limitations set forth in paragraph 1.6 of <br />the Agreement are applicable. <br />The duties and responsibilities of the RPR are limited to those of ARCHITECT in <br />ARCHITECrs agreement with the OWNER and in the construction Contract Documents, <br />and are further limited and described as follows: <br /> <br />A General <br /> <br />RPR is ARCHITECrs agent at the site. will act as directed by and under the <br />supervision of ARCHITECT, and will confer with ARCHITECT regarding RPR's actions. <br />RPR's dealings in matters pertaining to the on-site work shall in general be with <br />ARCHITECT and CONTRACTOR keeping OWNER advised as necessary. RPR's <br />dealings with subcontractors shall only be through or with the full knowledge and approval <br />of CONTRACTOR. RPR shall generally communicate with OWNER with the knowledge <br />of and under the direction of ARCHITECT. <br /> <br />B. Duties and Responsibilities of RPR <br /> <br />1. Schedules: <br />Review the progress schedule, schedule of Shop Drawing submittals <br />and schedule of values prepared by CONTRACTOR and consult with <br />ARCHITECT concerning acceptability. <br /> <br />2. Conferences and Meetings: <br /> <br />B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.