My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2322
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 2:55:31 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/26/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />. <br /> <br />recommend to ARCHITECT Change Orders, WorK Directive <br />Changes, and Field Orders. <br /> <br />d. Report immediately to ARCHITECT and OWNER upon the <br />occurrence of any accident. <br /> <br />10. Payment Requests: <br />Review applications for payment with CONTRACTOR for compliance <br />with the established procedure for their submission and forward with <br />recommendations to ARCHITECT, noting particularly the relationship <br />of the payment requested to the schedule of values, WorK completed, <br />and materials and equipment delivered at the site but not <br />incorporated in the Work. <br /> <br />11. Certificates, Maintenance and Operation Manuals: <br />During the course of the WorK, verify that certificates, maintenance <br />and operation manuals and other data required to be assembled and <br />furnished by CONTRACTOR are applicable to the items actually <br />installed and in accordance with the Contract Documents, and have <br />this material delivered to ARCHITECT for review and forwarding to <br />OWNER prior to final payment for the Work. <br /> <br />12. Completion: <br />a. Before ARCHITECT issues a Certificate of Substantial <br />Completion, submit to CONTRACTOR a list of observed items <br />requiring completion or correction. <br /> <br />b. Conduct final inspection in the company of ARCHITECT, <br />OWNER, and CONTRACTOR and prepare a final list of items <br />to be completed or corrected. <br /> <br />C. Observe that all items on final list have been completed or <br />corrected and make recommendations to ARCHITECT <br />concerning acceptance. <br /> <br />C. Umitations of Authority <br /> <br />Resident Project Representative: <br /> <br />1. Shall not authorize any deviation from the Contract Documents or <br />substitution of materials or equipment, unless authorized by ARCHITECT. <br /> <br />2. Shall not exceed limitations of ARCHITECTs authority as set forth in the <br />Agreement or the Contract Documents. <br /> <br />3. Shall not undertake any of the responsibilities of CONTRACTOR, <br />subcontractors or CONTRACTOR's superintendent. <br /> <br />B-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.