My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2318
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 3:01:12 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/12/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposal- Emergency Operations ~er <br />City of La Porte, Texas <br />Wednesday, April 07,1999 <br />Page 2 of3 <br /> <br />e <br /> <br />project exists, but the total amount to be budgeted and obtained is dependent upon the size and <br />scope that is defined in the completed Planning Report <br /> <br />SCOPE OF SERVICES <br /> <br />PREDESIGN (pART ONE) <br /> <br />This first phase of services would include a series of in-depth staff interviews, an analysis of <br />fmdings from those interviews, development of construction budgets, and the preparation of a <br />fmal Report. There is no provision at this time for any additional meetings, if any, with outside <br />groups, such as the Citizens' Advisory Committee (CAC). There is no provision for studies of <br />alternate sites for the facility, either. We can undertake these services, if authorized. Services in <br />connection with visits to completed facilities of a similar nature are not included but they can be <br />provided, if desired. Twenty-five (25) copies of the Report would be provided as part of this <br />proposal, and the actual cost of printing would be billed as a reimbursable expense. <br /> <br />BASIC ARCIDTECTURAL SERVICES (pART TWO) <br /> <br />Any subsequent services would be optional and dependent upon authorization given by the City <br />of La Porte to proceed with the project as a whole. If authorized, we would propose they be <br />provided using the City's standard form, styled "Agreement Between Owner and Architect for <br />Professional Services." <br /> <br />COMPENSATION FOR SERVICES <br /> <br />PREDESIGN (pART ONE) <br /> <br />Proposed on an Hourly Basis using pre-estabiished hourly billing rates (Exhibit A, attached), and <br />based on expending up to 144 manhours, with a maximum fee of $14,400, not to be exceeded <br />unless authorized by the City of La Porte. In addition to the above fee for services would be <br />reimbursable expenses mutually agreed upon, estimated not to exceed $4,000. Examples would <br />include reproduction costs at commercial rates, or equivalent if performed in-house, fax <br />transmissions and long distance telephone calls, and courier services for delivery between the <br />offices of the City and the Architect. <br /> <br />Billing for Compensation and Reimbursable Expenses would be combined for this project alone, <br />and submitted monthly, with payment expected within three weeks thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.