My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2312
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 3:06:57 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />tt <br /> <br />After written authorization to proceed with the Final Construction Documents <br />Phase, ARCHITECT shall: <br /> <br />1.4.1 Based on the approved Design Development DlJcuments and any further <br />adjustments in the scope or quality of the PROJECT, in the construction budget or in the <br />total PROJECT budget authorized in writing by the OWNER, the ARCHITECT shall <br />prepare, for approval by the OWNER, Construdion Documents consisting of Drawings <br />(hereinafter called Drawings) and Specifications setting forth in detail the requirements for <br />the construction of the PROJECT by Contractor(s). The sOE!cifications shall be prepared <br />in conformance with the sixteen-division format of the Construdion Specifications Institute. <br /> <br />1.4.2 See that the Construction Documents include applicable requirements/approvals of <br />governmental authorities having jurisdidion to approve the dE~sign of the project. Provide <br />technical criteria, written descriptions and design data for OWNER's use in filing <br />applications for permits with or obtaining approvals of such governmental authorities as <br />have jurisdiction to approve the design of the Project, and sissist OWNER in completing <br />permit application and in consultation with appropriate authorities. <br /> <br />1.4.3 Advise OWNER of any adjustments to the latest opini:on of probable Total Project <br />Costs (as defined in paragraph 1.2.4) caused by changes in general scope, extent or <br />character or design requirements of the Project or Construction Costs. Furnish to <br />OWNER a revised opinion of probable Total Project Costs based on the Drawings and <br />Specifications. <br /> <br />1.4.4 Prepare for review and approval by OWNER, its legal counsel and other advisors <br />contrad agreement forms, general conditions and supplementary conditions, and bid <br />forms, invitations to bid and instructions to bidders and other related documents. <br /> <br />The ARCHITECT will initially submit to OWNEI~ the Contractor Agreement <br />(in the form of AlA document A101) and the General Conditions of the Contract (in the <br />form of AlA document A201) for OWNER'S review, comment, modification, and approval. <br /> <br />1.4.5 Furnish five copies of the above documents (following approval) and of the <br />Drawings and Specifications and present and review them in person with OWNER. <br /> <br />The duties and responsibilities of ARCHITECT during the Construction <br />Documents Phase are supplemented as indicated in paragraph 4 of Exhibit A "Further <br />Description of Basic Services and Related Matters". <br /> <br />1.5 Bidding or Negotiation Phase <br /> <br />After written authorization to proceed with the Bidding or negotiation Phase, <br />ARCHITECT shall: <br /> <br />1.5.1 Following the OWNER's approval of the Construction 1D0cuments and of the latest <br />preliminary estimate of Construction Cost the ARCHITECT shall assist OWNER in <br />advertising for and obtaining bids or negotiating proposals for the prime contract for <br />construction, materials, equipment and services; and, where ~Ipplicable, maintain a record <br /> <br />1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.