<br />DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOUNT lHOWN, INCORRECT AMOUNT SHOWN IN PARENTl1ESES.
<br />
<br />-
<br />
<br /> (5) (6) (7) (8)
<br /> HUBCO INC. CONRAD CONSTRUCTION CO INC. WHITELAK INC. TEXAS-STERLING CONSTRUCTION
<br />SECTION 2 - UTILITY ADJUSTMENTS
<br />ITEM
<br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />8 Place and Test 6-inch Welded Steel W: tar Line LF 36 S 67.00 S 2,412.00 S 204.92 S 7,377.12 S 150.00 S 5.400.00 S 150.00 S 5,400,00
<br /> Including Appurtenances as per PI811S,
<br /> Min. Wall Thickness 0.280", Camplete
<br />9 Place and Test6-lnch P.V.C., C.900, \/I a1er LF 74 S 39.00 S 2,886.00 S 83.94 S 6,211.56 S 60.00 S 4,440.00 S 50.00 S 3,700.00
<br /> Line Includino ADourtenances as per Pi IllS
<br />10 Remove and Dipose Water Line Supp~ Pipe, LF 99 S 11.25 S 1,113.75 S 7.00 S 693.00 S 10.00 S 990.00 S 6.00 S 594.00
<br /> All Sizes, Camolete in Place
<br />11 Place and Te~t6-inch P.V.C., SDR-26 LF 21 S 35.00 S 735.00 S 67.30 S 1,413.30 S 75.00 S 1,575.00 S 65.00 S 1,365.00
<br /> Sanilarv Sewer Pipe, Camplete in Piae-'
<br />12 Place and TestS-inch P.V,C" SDR-26, LF 499 S 22,00 S 10,978.00 S 68.28 S 34,071.72 S 90.00 S 44,910.00 S 90,00 S 44,910.00
<br /> Sanitarv Sewer PiDe. Comolete in PllIO
<br />13 Place and Test Sanitary Sewer ManhDl,' EACH 1 S 1,400.00 S 1,400.00 S 1,971.04 S 1,971.04 S 2.500.00 S 2,500.00 S 5.000.00 S 5,000.00
<br /> Camolete in Place !Dr
<br />14 Remove and Dispose Sanitary Sewer EACH 1 S 750.00 S 750.00 S 400.00 S 400.00 S 1,000.00 S 1,000,00 S 900.00 S 900.00
<br /> Manhole. Comolete In Place !Dr
<br />15 Remove and Dispose 6-inch Sanitary S Mer LF 18 S 20.00 S 360.00 S 7.00 S 126,00 S 25.00 S 450.00 S 17.00 $ 306.00
<br /> Lead, Camolete in Place lor
<br />16 Remove and Dipose S-inch Sanitary Sf Ner LF 499 S 12.00 S 5,988.00 S 7.00 S 3,493.00 S 10.00 S 4,990.00 S 6.00 S 2,994.00
<br /> Pipe, Comolete in Place
<br />
<br />PageS of
<br />
<br />16
<br />
<br />-
<br />
<br />2
<br />'3
<br />
<br />'4
<br />'5
<br />6
<br />
<br />'7
<br />
<br />SECTION
<br />i'i'EM
<br />NO.
<br />I
<br />
<br />
<br />SITE I>REPARATION AND EARTHWl
<br />
<br />.!
<br />
<br /> (5) (6) (7) (8)
<br /> HUBCO, INC. CONRAD CONSTRUCTION CO INC. WHITELAK INC. TEXAS-STERLING CONSTRUCTION
<br />~ RK
<br /> UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />(lie SY 146 S 11.00 S 1,606.00 S 10.00 S 1,460.00 S 5.00 S 730.00 S 10.00 S 1,460.00
<br />i Ite SY 3,840 S 3.25 S 12,480.00 S 5.00 S 19,200.00 S 3.00 S 11,520.00 S 4.00 S 15,360.00
<br />Ill)
<br />i lie LF 910 S 14.50 S 13,195.00 S 8.00 S 7,280.00 S 10.00 S 9,100.00 S 8.00 S 7,280.00
<br />ine SY 44 S 15.00 S 660.00 $ 15.00 S 660.00 S 20.00 S 880.00 S 15.00 S 660.00
<br />i1d LS 1 S 1,500.00 S 1.500.00 S 1,500.00 S 1,500.00 ! S 1,000.00 S 1,000.00 S 2,000.00 S 2,000.00
<br />tems
<br /> LF 1,228 S 4.50 S 5,526.00 S 4.00 S 4,912.00 S 6.00 S 7,368.00 S 4.00 $ 4,912,00
<br /> LF 1,000 S 16.00 S 16,000.00 S 16.00 S 16,000.00 S 16.00 S 16,000.00 S 16.00 S 16,000.00
<br />eCTION 1 $ 50,967.00 $ 51,012.00 $ 46,598.00 $ 47,672.00
<br />
<br />BID TABULATION FOR
<br />SUNRISE DRIVE FROM H.e.F.e.D. UNIT A104-10~0 to FAIRFIELD AVENUE
<br />
|