Laserfiche WebLink
<br />e <br /> <br />DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOU"'T SHOWN. INCORRECT AMOUNT SHOWN IN PARENlliESES. <br /> <br /> (13) (14) <br /> CALCO CONTRACTING. INC. RAY FERGUSON INTERESTS INC. <br />SECTIO~ 4 - DRAINAGE SYSTEM <br />ITEM <br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID <br />23 18-1nch R.C.P., C-76, CI. III, Storm Sewer, LF 26 S 50.00 S 1,300.00 S 49.00 S 1,274.00 <br /> Comolete in Place for <br />24 24-lnch R.C.P., C.76, CI.III. Storm Sewer, LF 375 S 60.00 S 22,500.00 S 75.00 S 28,125.00 <br />~ Comolete In Place for <br />3O-inch R.C,P., C-76, CI. III. Storm Sewer, LF 44 S 85,00 S 3,740.00 S 89.00 . 3,916.00 <br />-,r Complete in Place for <br />42.lnch R.C,P., C-76, CI. III, Storm Sewer, LF 40 S 142.00 S 5,680.00 S 115.00 S 4,600.00 <br />--x;- Comolete In Place for <br />4B-lnch R.C.P., C-76, CI. III, Storm Sewer, LF 117 S 171.00 S 20,007.00 S 139.00 S 16,263.00 <br />~ Comolete in Place for <br />4'x4' R.C.B.,C850, Storm Sewer,lncluding LF 268 S 177.00 S 47,436.00 S 236.00 S 63,248.00 <br /> Reducers end Transltions,Complete In Place <br />29 5'x4' R.C.B.,C850, Storm Sewer,including LF 775 S 218.00 S 168.950.00 S 268.00 S 207,700.00 <br /> Reducers and TransiliDnS,Complete in Place <br />30 6'x4' R.C.B., C850, Storm Sewer, LF 1,529 S 256.00 S 391,424.00 S 319.00 S 487,751.00 <br /> Comolete In Place for <br /> <br />Page14 of <br /> <br />16 <br /> <br /> (13) (14) <br /> CALCO CONTRACTING, INC. RAY FERGUSON INTERESTS INC. <br />SECTION 3 - STORM WATER POLLUTION PREVENTION <br />ITEM <br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID <br />21 Hydro-Mulch Seeding, Complete for ACRE 0.4 S 1,100.00 S 440.00 S 2,500.00 S 1,000.00 <br />22 Block SDdding, Complete for SY 320 S 4.00 S 1,280.00 S 4.00 S 1,280.00 <br /> TOTAL COST - SECTION 3 $ 1,720.00 $ 2,280.00 <br /> <br />e <br /> <br /> I <br /> (13) (14) <br /> CALCO CONTRACTING INC. RAY FERGUSON INTERESTS INC. <br />SECTION l - UTIUTY ADJUSTMENTS <br />ITEM <br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID <br />17 RemDYtl and Relay Existing 12" R.C.P. LF 36 S 41.00 S .' 1,476.00 S 47.00 S 1,692.00 <br /> ,Complete In Place for <br />18 Sanitary Sewer Bypass Pumping LS 1 S 10,000.00 S 10,000.00 S 11,500.00 S 11,500.00 <br /> Comolete In Place for <br />19 Trench Safely System (5'-10'), All Widths LF 333 S 2,00 S 666.00 S 10.00 S 3,330.00 <br /> Comolete In Place for <br />20 Trench Safely System (5'-10'), All Widths LF 292 S 4.00 S 1,168.00 S 12.00 S 3,504.00 <br /> Complete In Place for <br />- TOTAL COST. SECTION 2 $ 65,655.00 $ 119,012.00 <br /> (*$65,691.00) <br /> <br />SUNRISE DRIVE <br /> <br />FROM H.e.F.e.D. UNIT A104.10~O to FAIRFIELD AVENUE <br /> <br />BID TABULATION FOR <br />