<br />e
<br />
<br />DENOTES ERROR IN BID DOCUMENT. CORRECTED AMOU"'T SHOWN. INCORRECT AMOUNT SHOWN IN PARENlliESES.
<br />
<br /> (13) (14)
<br /> CALCO CONTRACTING. INC. RAY FERGUSON INTERESTS INC.
<br />SECTIO~ 4 - DRAINAGE SYSTEM
<br />ITEM
<br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />23 18-1nch R.C.P., C-76, CI. III, Storm Sewer, LF 26 S 50.00 S 1,300.00 S 49.00 S 1,274.00
<br /> Comolete in Place for
<br />24 24-lnch R.C.P., C.76, CI.III. Storm Sewer, LF 375 S 60.00 S 22,500.00 S 75.00 S 28,125.00
<br />~ Comolete In Place for
<br />3O-inch R.C,P., C-76, CI. III. Storm Sewer, LF 44 S 85,00 S 3,740.00 S 89.00 . 3,916.00
<br />-,r Complete in Place for
<br />42.lnch R.C,P., C-76, CI. III, Storm Sewer, LF 40 S 142.00 S 5,680.00 S 115.00 S 4,600.00
<br />--x;- Comolete In Place for
<br />4B-lnch R.C.P., C-76, CI. III, Storm Sewer, LF 117 S 171.00 S 20,007.00 S 139.00 S 16,263.00
<br />~ Comolete in Place for
<br />4'x4' R.C.B.,C850, Storm Sewer,lncluding LF 268 S 177.00 S 47,436.00 S 236.00 S 63,248.00
<br /> Reducers end Transltions,Complete In Place
<br />29 5'x4' R.C.B.,C850, Storm Sewer,including LF 775 S 218.00 S 168.950.00 S 268.00 S 207,700.00
<br /> Reducers and TransiliDnS,Complete in Place
<br />30 6'x4' R.C.B., C850, Storm Sewer, LF 1,529 S 256.00 S 391,424.00 S 319.00 S 487,751.00
<br /> Comolete In Place for
<br />
<br />Page14 of
<br />
<br />16
<br />
<br /> (13) (14)
<br /> CALCO CONTRACTING, INC. RAY FERGUSON INTERESTS INC.
<br />SECTION 3 - STORM WATER POLLUTION PREVENTION
<br />ITEM
<br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />21 Hydro-Mulch Seeding, Complete for ACRE 0.4 S 1,100.00 S 440.00 S 2,500.00 S 1,000.00
<br />22 Block SDdding, Complete for SY 320 S 4.00 S 1,280.00 S 4.00 S 1,280.00
<br /> TOTAL COST - SECTION 3 $ 1,720.00 $ 2,280.00
<br />
<br />e
<br />
<br /> I
<br /> (13) (14)
<br /> CALCO CONTRACTING INC. RAY FERGUSON INTERESTS INC.
<br />SECTION l - UTIUTY ADJUSTMENTS
<br />ITEM
<br />NO. DESCRIPTION UNIT BID QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID
<br />17 RemDYtl and Relay Existing 12" R.C.P. LF 36 S 41.00 S .' 1,476.00 S 47.00 S 1,692.00
<br /> ,Complete In Place for
<br />18 Sanitary Sewer Bypass Pumping LS 1 S 10,000.00 S 10,000.00 S 11,500.00 S 11,500.00
<br /> Comolete In Place for
<br />19 Trench Safely System (5'-10'), All Widths LF 333 S 2,00 S 666.00 S 10.00 S 3,330.00
<br /> Comolete In Place for
<br />20 Trench Safely System (5'-10'), All Widths LF 292 S 4.00 S 1,168.00 S 12.00 S 3,504.00
<br /> Complete In Place for
<br />- TOTAL COST. SECTION 2 $ 65,655.00 $ 119,012.00
<br /> (*$65,691.00)
<br />
<br />SUNRISE DRIVE
<br />
<br />FROM H.e.F.e.D. UNIT A104.10~O to FAIRFIELD AVENUE
<br />
<br />BID TABULATION FOR
<br />
|