My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2311
LaPorte
>
.Ordinances
>
1990's
>
1999
>
O-1999-2311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 3:07:58 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TOTAL CONSTRUCTION COST - SUNRISE DRIVE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DENOlES ERROR IN BID DOCUNENT. CORREClED AMOUIIT SHOVlotl. INCORRECT AMOUNT SHOVlotlIN PARENTliESES, <br /> <br />1,036,811.70 <br />(.$1.036.847.70) <br /> <br />Page16 of <br /> <br />16 <br /> <br />e <br /> <br />$ <br /> <br /> (13) (14) <br />~ 6. TRAFFIC SIGNS AND TRAFFIC MARKERS CALCO CONTRACTING. INC. RAY FERGUSON INTERESTS INC. <br />ITEM <br />NO. DESCRIPTION UNIT BIO QUANT. UNIT BID TOTAL BID UNIT BID TOTAL BID <br />52 Place, Maintain and Remove Project Signs, EACH 3 S 900.00 S 2.700.00 S 900.00 S 2,700.00 <br /> Harris Countv, Comolete In Place for <br />53 Trallic Handling and Control during LS 1 S 10,000.00 S 10.000.00 S 38,000.00 S 38,000.00 <br /> Construction including Signs. Banicedes. <br /> and Channelizino Devices, Comolete In Place <br />54 White Relectorized Solid Pavement Markings SF 1,891.7 S 1.00 S 1,891.70 S 1.20 S 2,270.04 <br /> Widths as oer Plans, Comolete In Place <br /> TOTAL COST. SECTION 6 S 14,591.70 S 42,970.04 <br /> <br />$ <br /> <br />1 ,391 ,126.44 <br /> <br />50 <br /> <br />51 <br /> <br />e <br /> <br />49 <br /> <br />DESCRIPTION <br />Prime Coal. MC-30 <br />Complete In Place lor <br />Tack Coal <br />Complete In Place for <br />Milling Asphalt Concrete Pavement, 2.lnch, <br />Complete In Place lor <br />6" Thick Reinforced Concrete Driveways, <br />Com....e.\ete In Place lor <br />TOTAL COST. SECTION 5 <br /> <br />SY <br /> <br />1~ <br /> <br />S <br /> <br />50.00 <br /> <br />s <br /> <br />S <br /> <br />77,111.00 <br /> <br />6,900.00 <br /> <br />S <br /> <br />s <br /> <br />66,292.40 <br /> <br />40.00 <br /> <br />$ <br /> <br />5,~.00 <br /> <br />SY <br /> <br />GAL <br /> <br />4,092 <br /> <br />310 <br /> <br />l <br /> <br />I <br /> <br />4,00 <br /> <br />2.00 <br /> <br />S <br /> <br />S <br /> <br />16.368.00 <br /> <br />620.00 <br /> <br />I <br /> <br />$ <br /> <br />2.20 <br /> <br />2.00 <br /> <br />$ <br /> <br />I <br /> <br />9,002.40 <br /> <br />~.OO <br /> <br />SECTIUN <br />i'i"EM <br />NO. <br />48 <br /> <br />UNIT <br />GAL <br /> <br />BID QUANT. <br />1,860 <br /> <br />$ <br /> <br />I <br /> <br />TOTAL BID <br />'3,720.00 <br /> <br />. . <br /> <br />PAVING <br /> <br />SUNRISE DRIVE <br /> <br />I <br /> <br />FROM H.C.F.C.D. UNIT A104-10-o0 to FAIRFIELD AVENUE <br /> <br />BID TABULATION FOR <br /> <br />(13) <br />CALCO CONTRACTING. INC. <br /> <br />$ <br /> <br />$ <br /> <br />(14) <br />RAY FERGUSON INTERESTS~ INC. <br /> <br />TOTAL BIO <br />3,720.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.