Laserfiche WebLink
<br />: (.'C~j~ <br /> <br />l, ----- - <br /> <br />-- LaPorte: aterline Improvements 1999 <br /> <br />e <br /> <br />e <br /> <br />SCHEDULE OF UNIT PRICE WORK <br /> <br />PRELIMINARY COST ESTIMATE - 12/17/98 <br /> <br />BASE UNIT PRICES FOR: <br /> <br />ITEM ITEM DESCRIPTION UNIT QTY. UNIT PRICE IN TOTAL IN <br />No. FIGURES FIGURES <br /> Park Drive <br /> WATER: <br />1 8" PVC Open Cut L.F. 2,800 $ 35.00 $ 98,000.00 <br />2 8" PVC Auger L.F. 420 $ 55.00 $ 23,100.00 <br />3 Fire Hydrants Each 7 $ 1,900.00 $ 13,300.00 <br />4 6" F .H. Leads Each 42 $ 19.00 $ 798.00 <br />5 8" x 8" T.S. & V. Each 1 $ 1,800.00 $ 1,800.00 <br />6 8" Wet Connection Each 1 $ 1,200.00 $ 1,200.00 <br />7 6" x 8" T.S. & V. Each 7 $ 1,500.00 $ 10,500.00 <br />8 8" Cut and Plug Each 2 $ 900.00 $ 1,800.00 <br />9 8" Temporary Plugs Each 2 $ 500.00 $ 1,000.00 <br />10 Remove and Salvage Fire Hydrant & Each 3 $ 500.00 $ 1,500.00 <br /> Valve <br />11 Trench Safety L.F. 2,800 $ 2.00$ 5,600.00 <br />12 Long or Short Service Each 10 $ 475.00 $ 4,750.00 <br /> TOTAL $ 163,348.00 <br /> MISC. EXTRA WORK: <br />14 Extra Bank Sand C.Y. 50 $ 15.00 $ 750.00 <br />15 Extra Concrete C.Y. 5 $ 10.00 $ 50.00 <br />16 Misc. Extra - - 15% of Total $ 24,622.20 <br /> TOTAL $ 25,422.20 <br /> PARK DRIVE TOTAL 1$ 188 770.20 <br />