My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1999-2304
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1999
>
O-1999-2304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:02 PM
Creation date
7/25/2006 3:33:55 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
1/11/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />NanCE OF SUPPLEMENTAL GENERAL CONDmONS AND SPECIAL CONDmONS <br /> <br />Attention is particularly called to those parts of the contract documents and specifications <br />which deal with the following: <br />a. Survey, Permits and Regulations <br />b. Protection of Work and Property <br />c. Time of Completion and Liquidated Damages <br />d. Subsurface Conditions Found Different <br />e. Insurance <br />f. Separate Contract <br />g. Subcontracting <br />h. Photographs of the Project <br /> <br />LAWS AND REGULATIONS <br /> <br />The bidder's attention is directed to the fact that all applicable State laws, municipal <br />ordinances, and the rules and regulations of all authorities having jurisdiction over <br />construction of the project shall apply to the contract throughout, and they will be deemed <br />to be included in the contract the same as though herein written out in full. <br /> <br />METHOD OF AWARD - LOWEST QUALIFIED BIDDERS <br /> <br />If at the time this contract is to be awarded, the lowest base bid submitted by a responsible <br />bidder does not exceed the amount of funds then estimated by the Owner as available to <br />fInance the contract, the contract will be awarded on the base bid only. If such bid exceeds <br />such amount, the Owner may reject all bids. <br /> <br />The Owner further reserves the right to award the contract based on an adjusted base bid, <br />which shall consist of any combination of alternate bid items and bid items included in the <br />base bid. <br /> <br />OBliGATION OF BIDDER <br /> <br />At the time of the opening of bids each bidder will be presumed to have inspected the site <br />and to have read and to be thoroughly familiar with the plans and contract documents <br />(including all addenda). The failure or omission of any bidder to examine any form, <br />instrument or document shall ~ 110 way relieve any bidder from any obligation in respect to <br />his bid. <br /> <br />IDsbuclioDs 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.