Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />CCCIT~W <br /> <br />ARTICLE I <br /> <br />The location of the Project is generally identified by the attached Exhibit "A." The Project is more <br />specifically defined by drawings prepared by Landev Engineers, Inc. and extends from the west <br />line of the Union Pacific Railroad (approximate station 78+00) to the north right-of-way line of North <br />"P" Street (approximate station 11 +00). <br /> <br />ARTICLE II <br /> <br />The District shall coordinate preparation of the metes and bounds descriptions and tract maps <br />depicting the right-of-way acquisitions, and construction plans and specifications. The District shall <br />also administer bidding, construction, inspection, materials testing and surveying for the Project <br />at the District's sole expense. The District intends to bid and award construction of the Project in <br />the manner utilized by the District for similar projects, and to award the contract in accordance with <br />applicable competitive bidding laws. The District also is responsible for all pipeline relocations. <br /> <br />ARTICLE III <br /> <br />The City agrees to acquire at its expense the tracts identified on the attached Exhibit "A" or suitable <br />alternatives. The City further agrees to grant drainage easements to the District in a form approved <br />by both parties. The City may request that the District obtain a portion of the Project right-of-way <br />for the City, if the City notifies the District at least nine months before the start of construction. If <br />the District agrees to obtain the right-of-way for the City, the City shall pay the District for all right- <br />of-way costs within 30 days of receiving a cost statement from the District. The District recognizes <br />that the City would like to retain the rights to utilize the right-of-way for other purposes such as, but <br />not limited to, landscaping, pedestrian/equestrian trails, hike and bike trails, and utility installations, <br />which rights shall be subordinate to the District's right to use the right-of-way for drainage and flood <br />control purposes. The City also agrees to relocate any City-owned utilities affected by the Project, <br />at the City's sole expense. <br /> <br />ARTICLE IV <br /> <br />After the City has acquired the necessary right-of-way and after the City has conveyed drainage <br />easements to the District, the District shall pursue the bidding and construction phase of the <br />Project. The District agrees to utilize its best efforts to complete the Project within six months after <br />the date the easements are delivered to the District. The District shall notify the City in writing of <br />the bid price of the Project within thirty (30) days after verifying and accepting a legal bid for the <br />Project. <br /> <br />ARTICLE V <br /> <br />Either party may rescind this Agreement by giving thirty (30) days written notice to either party, as <br />provided for in Article X of the Agreement, if an acceptable bidder does not respond to the <br />advertisement, fails to execute the construction contract, or fails to provide the bonds required by <br />law. <br /> <br />ARTICLE VI <br /> <br />The District shall have the right to make any changes in the plans and specifications it may deem <br />necessary or desirable during the construction of the Project in consultation with the City. <br />However, neither party shall be obligated to expend any funds in excess of those herein specifically <br />allocated for the Project as a result of any change in said plans or specifications, except as <br />provided in Article VIII. <br /> <br />-2- <br />