My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-2237
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1998
>
O-1998-2237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:00 PM
Creation date
7/25/2006 4:47:58 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
5/18/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />This is EXHIBIT C, consisting of 5 pages, referred to in <br />and part of the Agreement between OWNER and <br />ENGINEER for Professional Services dated <br /> <br />,- <br /> <br />Initial : <br /> <br />OWNER <br />ENGINEER ~ <br /> <br />Payments to ENGINEER for Services and Reimbursable Expenses <br /> <br />Article 4 of the Agreement is amended and <br />supplemented to include the following agreement of <br />the parties: <br /> <br />of the total services actually completed during <br />the billing period to the Lump Sum. <br /> <br />ARTICLE 4 -- PAYMENTS TO THE ENGINEER <br /> <br />5. The Lump Sum is conditioned on <br />Contract Times to complete the Work not <br />exceeding 7 months. Should the Contract <br />Times to complete the Work be extended <br />beyond this period, the total co~pensation to <br />ENGINEER shall be appropriately adjusted. <br /> <br />C4.01 For Basic Services Having A Detennined <br />Scope --Lump Sum Method of Payment <br /> <br />A. OWNER shall pay ENGINEER for Basic <br />Services set forth in Exhibit A, except for services <br />of ENGINEER's Resident Project Representative <br />and Post-Construction Phase services, if any, as <br />follows: <br /> <br />1. A Lump Sum amount of $146,000 <br />based on the following assumed distribution of <br />compensation: <br /> <br />6. If more prime contracts are awarded <br />for Work designed or specified by ENGINEER <br />for this Project than identified in Exhibit A, the <br />ENGINEER shall be compensated an additional <br />amount to be determined by ENGINEER and <br />OWNER for all Basic Services for each prime <br />contract added. <br /> <br />a. Study and Report Phase <br />b. Preliminary Design Phase <br />c. Final Design Phase <br />d. Bidding and Negotiating Phase <br />e. Construction Phase <br /> <br />nla <br />nla <br />$122,100 <br />$6,000 <br />$17,900 <br /> <br />2. ENGINEER may alter the distribution <br />of compensation between individual phases <br />noted herein to be consistent with services <br />actually rendered, but shall not exceed the total <br />Lump Sum amount unless approved in writing <br />by the OWNER. <br /> <br />3. The Lump Sum includes compensation <br />for ENGINEER's services and services of <br />ENGINEER's Consultants, if any. Appropriate <br />amounts have been incorporated in the Lump <br />Sum to account for labor, overhead, profit, and <br />Reimbursable Expenses. <br /> <br />4. The portion of the Lump Sum amount <br />billed for ENGINEER's services will be based <br />upon ENGINEER's estimate of the proportion <br /> <br />Page 1 of 5 pages <br />. (Exhibit C - Basic Services With Determined Scope -- Lump Sum Method) <br />
The URL can be used to link to this page
Your browser does not support the video tag.