<br />e <br /> <br />. <br /> <br />11. Construction Contract--The entire and <br />integrated written agreement between the OWNER and <br />Contractor concerning the Work. <br /> <br />no cost to OWNER, any Defective Work, normally <br />one year after the date of Substantial Completion or <br />such longer period of time as may be prescribed by <br />Laws or Regulations or by the terms of any applicable <br />special guarantee or specific provision of the Contract <br />Documents. <br /> <br />12. Construction Cost--The cost to OWNER of <br />those portions of the entire Project designed or <br />specified by ENGINEER. Construction Cost does not <br />include costs of services of ENGINEER or other <br />design professionals and consultants, cost of land, <br />rights-of-way, or compensation for damages to <br />properties, or OWNER's costs for legal, accounting, <br />insurance counseling or auditing services, or interest <br />and financing charges incurred in connection with the <br />Project, or the cost of other services to be provided by <br />others to OWNER pursuant to Exhibit B of this <br />Agreement. Construction Cost is one of the items <br />comprising Total Project Costs. <br /> <br />18. Defective--An . adjective which, when <br />modifying the word Work, refers to Work that is <br />unsatisfactory, faulty, or deficient, in that it does not <br />conform to the Contract Documents, or does not meet <br />the requirements of any jnspection, reference standard, <br />test, or approval referred to in the Contract Documents, <br />or has been damaged prior to ENGINEER's <br />recommendation of fmal payment. <br /> <br />13. Contract Documents--Documents that <br />establish the rights and obligations of the parties <br />engaged in construction and include the Construction <br />Agreement between OWNER and Contractor, <br />Addenda (which pertain to the Contract Documents), <br />Contractor's Bid (including documentation <br />accompanying the Bid and any post-Bid <br />documentation submitted prior to the notice of award) <br />when attached as an exhibit to the Construction <br />Agreement, the notice to proceed, the bonds, <br />appropriate certifications, the General Conditions, the <br />Supplementary Conditions, the Specifications and the <br />Drawings as the same are more specifically identified <br />in the Construction Agreement, together with all <br />Written Amendments, Change Orders, Work Change <br />Directives, Field Orders, and ENGINEER's written <br />interpretations and clarifications issued on or after the <br />Effective Date of the Construction Agreement. <br />Approved Shop Drawings and the reports and <br />drawings of subsurface and physical conditions are not <br />Contract Documents. <br /> <br />19. Documents--Data, reports, Drawings, <br />Specifications, Record Drawings, and other <br />deliverables, whether in printed or electronic media <br />format, provided or furnished in appropriate phases by <br />ENGINEER to OWNER pursuant to this Agreement. <br /> <br />20. Drawings-- That part of the Contract <br />Documents prepared or approved by ENGINEER <br />which graphically shows the scope, extent, and <br />character of the Work to be performed by Contractor. <br />Shop Drawings are not Drawings as so defined. <br /> <br />21. Effective Date of the Construction <br />Agreement-- The date indicated in the Construction <br />Agreement on which it becomes effective, but if no <br />such date is indicated, it means the date on which the <br />Construction Agreement is signed and delivered by the <br />last of the two parties to sign and deliver. <br /> <br />22. Effective Date of the Agreement-- The date <br />indicated in this Agreement on which it becomes <br />effective, but if no such date is indicated, it means the <br />date on which the Agreement is signed and delivered <br />by the last of the two parties to sign and deliver. <br /> <br />14. Contract Price--The moneys payable by <br />OWNER to Contractor for completion of the Work in <br />accordance with the Contract Documents and as stated <br />in the Construction Agreement. <br /> <br />23. ENGINEER's Consultants--Individuals or <br />entities having a contract with ENGINEER to furnish <br />services with respect to this Project as ENGINEER's <br />independent professional associates, consultants, <br />subcontractors, or vendors. The term ENGINEER <br />includes ENGINEER's Consultants. <br /> <br />15. Contract Times--The numbers of days or the <br />dates stated in the Construction Agreement to: <br />(i) achieve Substantial Completion, and (ii) complete <br />the Work so that it is ready for fmal payment as <br />evidenced by ENGINEER's written recommendation <br />of final payment. <br /> <br />24. Field Order--A written order issued by <br />ENGINEER which directs minor changes in the Work <br />but which does not involve a change in the Contract <br />Price or the Contract Times. <br /> <br />16. Contractor--An individual or entity with <br />whom OWNER enters into a Construction Agreement. <br /> <br />25. General Conditions-That part of the Contract <br />Documents which sets forth terms, conditions, and <br />procedures that govem the Work to be performed or <br />furnished by Contractor with respect to the Project. <br /> <br />17. Co"ection Period-- The time after Substantial <br />Completion during which Contractor must correct, at <br /> <br />Standard Form of Agreement <br />Between Owner and Engineer for Professional Services <br />Page 9 of 12 <br />