My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-2237
LaPorte
>
.Ordinances
>
1990's
>
1998
>
O-1998-2237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:00 PM
Creation date
7/25/2006 4:47:58 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
5/18/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />(Reverse side of Notice) <br /> <br />CONDITIONS OF NOTICE OF ACCEPTABILITY OF WORK <br /> <br />The Notice of Acceptability of Work ("Notice") on the front side of this sheet is expressly made subject to the <br />following terms and conditions to which all persons who receive said Notice and rely thereon agree: <br /> <br />I. Said Notice is given with the skill and care ordinarily used by members of the engineering profession <br />practicing under similar conditions at the same time and in the same locality. <br /> <br />2. Said Notice reflects and is an expression of the professional judgment of ENGINEER. <br /> <br />3. Said Notice is given as to the best of ENGINEER's knowledge, information, and belief as of the date hereof. <br /> <br />4. Said Notice is based entirely on and expressly limited by the scope of services ENGINEER has been <br />employed by OWNER to perform or furnish during construction of the Project (including observation of the <br />CONTRACTOR's work) under ENGINEER's Agreement with OWNER and under the Construction <br />Contract referenced on the reverse hereof, and applies only to facts that are within ENGINEER's knowledge <br />or could reasonably have been ascertained by ENGINEER as a result of carrying out the responsibilities <br />specifically assigned to ENGINEER under ENGINEER's Agreement with OWNER and the Construction <br />Contract referenced on the reverse hereof. <br /> <br />5. Said Notice is not a guarantee or warranty of CONTRACTOR's performance under the Construction <br />Contract referenced on the reverse hereof nor an assumption of responsibility for any failure of <br />CONTRACTOR to furnish and perform the Work thereunder in accordance with the Contract Documents. <br /> <br />Page 2 of 2 Pages <br />(Exhibit E - Notice of Acceptability of Work) <br />
The URL can be used to link to this page
Your browser does not support the video tag.