Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />c. ENGINEER shall transmit these documents to OWNER <br /> <br />16. Substantial Completion. Promptly after notice from Contractor that Contractor considers the entire Work <br />ready for its intended use, in company with OWNER and Contractor, conduct an inspection to determine if the <br />Work is Substantially Complete. If after considering any objections of OWNER, ENGINEER considers the Work <br />Substantially Complete, ENGINEER shall deliver a certificate of Substantial Completion to OWNER and <br />Contractor. <br /> <br />17. Additional Tasks. Perform or provide the following additional Construction Phase tasks or deliverables: <br /> <br />18. Final Notice of Acceptability of the Work. Conduct a final inspection to determine if the completed Work <br />of Contractor is acceptable so that ENGINEER may recommend, in writing, fInal payment to Contractor. <br />Accompanying the recommendation for final payment, ENGINEER shall also provide a notice in the form <br />attached hereto as Exhibit E (the "Notice of Acceptability of Work") that the Work is acceptable (subject to the <br />provisions of paragraph A1.0S.A.14.b) to the best of ENGINEER's knowledge, information, and belief and based <br />on the extent of the services provided by ENGINEER under this Agreement. <br /> <br />19. Record Drawings. Prepare and furnish to Owner Record Drawings showing appropriate record <br />information based on Project annotated record documents received from Contractor. <br /> <br />B. Duration of Construction Phase. The Construction Phase will commence with the execution of the first <br />Construction Agreement for the Project or any part thereof and will tenninate upon written recommendation by <br />ENGINEER for final payment to Contractors. If the Project involves more than one prime contract as indicated in <br />paragraph A1.03.C, Construction Phase services may be rendered at different times in respect to the separate contracts. <br /> <br />C. Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any <br />Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing any <br />of the Work. ENGINEER shall not be responsible for failure of any Contractor to perform ot furnish the Work in <br />accordance with the Contract Documents. <br /> <br />Al.06 Post-Construction Phase -- NOT INCLUDED <br /> <br />PART 2 - ADDmONAL SERVICES <br /> <br />A2.01 Additional Services Requiring OWNER's Authorization in Advance <br /> <br />A. If authorized in writing by OWNER, ENGINEER shall furnish or obtain from others Additional Services of <br />the types listed below. These services will be paid for by OWNER as indicated in Article 4 of the Agreement. <br /> <br />I. Preparation of applications and supporting documents (in addition to those furnished under Basic <br />Services) for private or governmental grants, loans or advances in connection with the Project; preparation or <br />review of environmental assessments and impact statements; review and evaluation of the effects on the design <br />requirements for the Project of any such statements and documents prepared by others; and assistance in obtaining <br />approvals of authorities having jurisdiction over the anticipated environmental impact of the Project. <br /> <br />2. Services to make measured drawings of or to investigate existing conditions or facilities, or to verify the <br />accuracy of drawings or other information furnished by OWNER <br /> <br />3. Services resulting from significant changes in the scope, extent, or character of the portions of the Project <br />designed or specified by ENGINEER or its design requirements including, but not limited to, changes in size, <br />complexity, OWNER's schedule, character of construction, or method of fmancing; and revising previously <br />accepted studies, reports, Drawings, Specifications, or Contract Documents when such revisions are required by <br />changes in Laws and Regulations enacted subsequent to the Effective Date of this Agreement or are due to any <br />other causes beyond ENGINEER's control. <br /> <br />Page 5 of 7 Pages <br />(Exhibit A - ENGINEER's Services) <br />