My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-2231
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1998
>
O-1998-2231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:00 PM
Creation date
7/25/2006 4:53:05 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />1.6.2 .3 The purpose of ARCHITECT I s visits to and representation <br />by the Resident Project Representative (and assistant, if any) at <br />the site will be to enable ARCHITECT to better carry out the duties <br />and responsibilities assigned to and undertaken by ARCHITECT during <br />the Construction Phase, and, in addition, by exercise of <br />ARCHITECT's efforts as an experienced and qualified design <br />professional, to provide for OWNER a greater degree of confidence <br />that the completed work of Contractor(s) will conform generally to <br />the Contract Documents and that the integrity of the design concept <br />as reflected in the Contract Documents has been implemented and <br />preserved by Contractor(s). On the other hand, ARCHITECT shall <br />not, during such visits or as a result of such observations of <br />Contractor(s)' work in progress, supervise, direct or have control <br />over Contractor(s)' work nor shall ARCHITECT have authority over or <br />responsibility for the means, methods, techniques, sequences or <br />procedures of construction selected by Contractor (s), for safety <br />precautions and programs incident to the work of Contractor(s) or <br />for any. failure of Contractor(s) to comply with laws, rules, <br />regulations, ordinances, codes or orders applicable to <br />Contractor(s) furnishing and performing their work. <br /> <br />1.6.4Interpretations and Clarifications <br /> <br />ARCHITECT shall issue necessary interpretations and <br />clarifications of the Contract Documents and in connection <br />therewith prepare work directive changes; and after consultation <br />with owner, prepare change orders as required for owners review and <br />approval. <br /> <br />1.6.5Shop Drawings <br /> <br />ARCHITECT shall review and approve (or take other <br />appropriate action in respect of) Shop Drawings (as that term is <br />defined in the General Conditions), product data, sample (s) and <br />other data which Contractor(s} are required to submit, but only for <br />conformance with the design concept of the Project and compliance <br />with the information given in the Contract Documents. Such reviews <br />and approvals or other action shall not extend to means, methods, <br />techniques, sequences or procedures of construction or to safety <br />precautions and programs incident thereto. <br /> <br />1.6.6Substitutes <br /> <br />ARCHITECT shall evaluate and determine the acceptability <br />of substitute materials and equipment proposed by Contractor(s), <br />but subject to the provision of paragraph 2.2.2. (Required <br />Additional Services) All substitutes shall be approved by OWNER. <br /> <br />1-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.