My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1998-2231
LaPorte
>
Legislative Records
>
Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1998
>
O-1998-2231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:00 PM
Creation date
7/25/2006 4:53:05 PM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
4/13/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />duties and responsibilities assumed by ARCHITECT in the Contract <br />Documents. <br /> <br />The duties and responsibilities of the ARCHITECT during <br />the Construction Phase are amended and supplemented as indicated in <br />Paragraph 6, Exhibit A "Further Description of Basic Services and <br />Related Matters". <br /> <br />1.7 Operational Phase <br /> <br />During the Operational Phase, ARCHITECT shall: <br /> <br />1.7.lFurnish the deliverable items referred to in <br />Section 1.6.10 and in the Operational Phase and present and review <br />them in person with OWNER. <br /> <br />1.7.2Define in Contract Documents the Contractor(s) (and or <br />Vendor(s)) responsibility in connection with the start up, <br />refining, and adjustment of any equipment or system. <br /> <br />1.7.3Define in Contract Documents the Contractor(s) (and or <br />Vendor(s)) responsibility for training owners staff to operate and <br />maintain any equipment or system and for reviewing pertinent <br />manuals, submittals, shop drawings, and warranties supplied by the <br />Contractor(s), Vendor(s), or Manufacturer(s) as the case may be. <br /> <br />1.7.4Coordinate, attend and participate in the start up and <br />training orientations as described in paragraphs 1.7.2 and 1.7.3. <br /> <br />1.7.5Record Drawings. <br /> <br />ARCHITECT shall furnish the OWNER a set of marked up <br />prints, drawings and other data kept by the Contractor (s) I and <br />Project Representative (if employed by the ARCHITECT) in a form and <br />manner that clearly depicts significant changes made during the <br />construction process. <br /> <br />1.7.6At a time eleven (11) months following Substantial Completion <br />of the project (one month prior to expiration of the Contractor's <br />warranty period), the ARCHITECT, in the company of the OWNER, will <br />. visit the project to observe any apparent deficiencies in the <br />completed construction, and document any items observed in a <br />written report issued to the CONTRACTOR and OWNER. <br /> <br />1. 7. 7 During the Operational Phase, the ARCHITECT will assist the <br />OWNER in consultations and discussions with CONTRACTOR concerning <br />the correction of deficiencies brought to the ARCHITECT's <br />attention, and when appropriate, review or make written <br />recommendations regarding replacement or correction of the Work as <br />proposed by the Contractor. <br /> <br />1-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.