My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-1997-2203
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
1990's
>
1997
>
O-1997-2203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:38:59 PM
Creation date
7/26/2006 7:42:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
11/24/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />". <br /> <br />. ~', I. <br />,. V. <br /> <br />"j' , <br />I. <br /> <br />i. ; <br /> <br />Sponsor shall disclose the source of all funds for the project <br />and its ability to finance and operate the project. <br /> <br />Expenditures for eligible project costs for the above project <br />made by the State or the Sponsor prior to the award of a <br />federal grant for said project, and prior to actual receipt of <br />the authority to expend federal grant funds, shall be made <br />from Sponsor funds. <br /> <br />PART III - Sponsor Responsibilities <br /> <br />1. In accepting the Agreement, the Sponsor guarantees that: <br /> <br />a. it will comply with the Attachment A, Airport Assurances <br />(06/02/97) (State Modified 7/97), attached hereto and made <br />a part of .this Agreement; and <br /> <br />b. it will, in the operation of the facility, comply with <br />all applicable. state and federal laws, rules, <br />regulations, procedures, covenants and assurances <br />required by the State of Texas or the FAA in connection <br />with the federal grant; and <br /> <br />c. the Airport or navigational facility which is the subject <br />of this Agreement shall be controlled for a period of at <br />least 20 years, and improvements made or acquired under <br />this project shall be operated, repaired and maintained <br />in a safe and serviceable manner for the useful life of <br />said improvements, not to exceed 20 years; and <br /> <br />d. consistent with safety and security requirements, it <br />shall make the airport or air navigational facility <br />available to all types, kinds and classes of aeronautical <br />use without unjust discrimination between such types, <br />kinds and classes and shall provide adequate public <br />access during the term of this Agreement: and <br /> <br />e. it shall not grant or permit anyone to exercise an <br />exclusive right for the conduct of aeronautical activity <br />on or about an airport landing area. Aeronautical <br />acti vi ties include, but are not limited to scheduled <br />airline flights, charter flights, flight instruction, <br />aircraft sales, rental and repair, sale of aviation <br />petroleum products and aerial applications. The landing <br />area consists of runways or landing strips, taxiways, <br />parking aprons, roads, airport lighting and navigational <br />aids; and <br /> <br />Page 4 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.