My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2002-2602
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2002
>
O-2002-2602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:09 PM
Creation date
7/27/2006 8:11:26 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/9/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />1.6.12 LIMITATION OF RESPONSIBILITIES <br /> <br />Engineer shall not be responsible for the acts or omissions of any Contractor, or of <br />any subcontractor or supplier, or any of the Contractor(s) or subcontractor's or supplier's <br />agents or employees or any other persons (except Engineer's own employees and <br />agents) at the site or otherwise furnishing or performing any of the Contractor(s)' work; <br />however, nothing contained in paragraphs 1.6.1 through 1.6.11 inclusive, shall be <br />construed to release Engineer from liability for failure to properly perform duties and <br />responsibilities assumed by Engineer in the Contract Documents. <br /> <br />The duties and responsibilities of the Engineer during the Construction <br />Phase are amended and supplemented as indicated in Paragraph 6, Exhibit A "Further <br />Description of Basic Services and Related Matters". <br /> <br />1.7 OPERATIONAL PHASE <br /> <br />During the Operational Phase, Engineer shall: <br /> <br />1.7.1 fumish the deliverable items referred to in Section 1.6.10 and in the Operational <br />Phase and present and review them in person with Owner. <br /> <br />1.7.2 Define in Contract Documents, the Contractor(s) (and or Vendor(s)) responsibility <br />in connection with the start up, refining, and adjustment of any equipment or system. <br /> <br />1.7.3 Define in Contract Documents the Contractor(s) (and or Vendor(s)) responsibility <br />for training owners staff to operate and maintain any equipment or system and for <br />reviewing pertinent manuals, submittals, shop drawings, and warranties supplied by the <br />Contractor(s), Vendor(s), or Manufacturer(s) as the case may be. <br /> <br />1.7.4 Coordinate, attend and participate in the start up and training orientations as <br />described in paragraphs 1.7.2 and 1.7.3. <br /> <br />1.7.5 RECORD DRAWINGS. <br /> <br />Engineer shall furnish the Owner a set of marked up prints, drawings and other <br />data kept by the Contractor(s), and Project Representative (if employed by the <br />ENGINEER) in a form and manner that clearly depicts significant changes made during <br />the construction process. <br /> <br />1.7.6 At a time eleven (11) months following Substantial Completion of the project (one <br />month prior to expiration of the Contractor's warranty period), the Engineer, in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.