Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />required which were not fumished by Owner in accordance with Section 3, and services <br />not otherwise provided for in this Agreement. <br /> <br />2.2 REQUIRED ADDITIONAL SERVICES <br /> <br />When required by the Contract Documents in circumstances beyond Engineer's <br />control, Engineer shall fumish or obtain from others, as circumstances require during <br />construction Additional Services of the types listed in paragraphs 2.2.1 through 2.2.6, <br />inclusive (except to the extent otherwise provided in Exhibit A "Further Description of <br />Basic Services and Related Matters"). These services are not included as part of Basic <br />Services. Engineer shall advise Owner promptly of need for required additional services. <br />If the Owner is in agreement, Owner shall provide authorization to Engineer for such <br />Additional Services, which will be paid for by Owner as indicated in Section 5. <br /> <br />2.2.1 Services in connection with work directive changes and change orders to reflect <br />changes requested by Owner if the resulting change in compensation for Basic Services <br />is not commensurate with the addition services rendered. <br /> <br />2.2.2 Services in making revisions to Drawings and Specifications occasioned by the <br />Owner's acceptance of substitutions proposed by Contractor(s); and services after the <br />award of each contract in evaluation and determining the acceptability of an <br />unreasonable or excessive number of substitutions proposed by Contractor. <br /> <br />2.2.3 Services resulting from significant delays, changes or price increases occurring as <br />a direct or indirect result of material, equipment or energy shortages. <br /> <br />2.2.4 Additional or extended services during construction made necessary by (1) work <br />damaged by fire or other cause during construction, (2) a significant amount of defective <br />or neglected work of any Contractor, (3) acceleration of the progress schedule involving <br />services beyond normal working hours, and (4) default by any Contractor. ' <br /> <br />2.2.5 Services (other than Basic Services during the Operation Phase) in connection <br />with any partial utilization of any part ~f the Project by Owner, prior to Substantial <br />Completion. <br /> <br />2.2.6 Evaluating an unreasonable or extensive number of claims submitted by <br />Contractor(s) or others in connection with the work. <br />