My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2002-2602
LaPorte
>
.Ordinances
>
2000's
>
2002
>
O-2002-2602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:09 PM
Creation date
7/27/2006 8:11:26 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
12/9/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />SECTION 4 - PERIODS OF SERVICE <br /> <br />4.1 The provisions of this Section 4 and the various rates of compensation for <br />Engineer's services provided for elsewhere in this Agreement have been agreed to in <br />anticipation of the orderty and continuous progress of the Project through completion of <br />the Construction Phase. Engineer's obligation to render services hereunder will extend <br />for a period, which may reasonably be required for the design, award of contracts, <br />construction and initial operation of the Project including extra work and required <br />extensions thereto. If in Exhibit A "Further Description of Basic Services and Related <br />Matters" specific periods of time for rendering services are set forth or specific dates by <br />which services are to be completed are provided and if such dates are exceeded through <br />no fault of Engineer, all rates, measures and amounts of compensation provided herein <br />shall be subject to equitable adjustment. <br /> <br />4.2 Omitted. <br /> <br />4.3 Upon written authorization from Owner, Engineer shall proceed with the <br />performance of the services called for in the Design Development Phase, and shall <br />submit preliminary design documents and a revised opinion of probable Total Project <br />Costs within the stipulated period indicated in paragraph 3 of Exhibit A "Further <br />Description of Basic Services and Related Matters". <br /> <br />4.4 After acceptance by Owner of the Design Development Phase documents, <br />indicating any specific modifications or changes in the general scope, extent or character. <br />of the Project desired by Owner, and upon written authorization from Owner, Engineer <br />shall proceed with the performance of the services called for in the Construction <br />Documents Phase; and shall deliver Contract Documents and a revised opinion of <br />probable Total Project Costs for all work of Contractor(s) on the Project within the <br />stipulated period indicated in paragraph 4 of Exhibit A "Further Description of Basic <br />Services and Related Matters". <br /> <br />4.5 Engineer's services under the Design Development and Construction Documents <br />shall each be considered complete at the eartier of (1) the date when the submissions for <br />that phase have been accepted by Owner or (2) thirty days after the date when such <br />submissions are delivered to Owner for final acceptance, plus in each case such <br />additional time as may be required for obtaining approval of governmental authorities <br />having jurisdiction to approve the design of the Project. <br /> <br />4.6 After acceptance by Owner of the Engineer's Drawings, Specifications and <br />Construction Documents Phase documentation including the most recent opinion of <br />probable Total Project Cost and upon written authorization to proceed, Engineer shall <br />
The URL can be used to link to this page
Your browser does not support the video tag.