Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />SECTION 5 - PAYMENTS TO ENGINEER <br /> <br />5.1 Omitted. <br /> <br />5.1.1 For Basic Services. Owner shall pay Engineer for Basic Services rendered under <br />Section 1 (as amended and supplemented by Exhibit A "Further Description of Basic <br />Services and Related Matters") as follows: <br /> <br />5.1.1.1 A lump sum in the amount of nineteen thousand six hundred dollars ($ <br />19,600.00). Progress payments for Basic Services in each phase shall total the following <br />percentages of the total basic compensation payable: <br /> <br />Design Development Phase . <br />Construction Documents Phase <br />Bidding Phase <br />Construction Phase <br />Operational Phase <br /> <br />(30%) <br />(45%) <br />(05%) <br />(15%) <br />(05%) <br /> <br />$ 5,880.00 <br />$ 8,820.00 <br />$ 980.00 <br />$ 2,940.00 <br />$ 980.00 <br /> <br />Total Compensation for Basic Services 9; 19,60000 <br /> <br />5.1.1.2 Should the Engineer's Preliminary Construction Cost Estimate or the lowest <br />bona fide proposal or bid amount exceed the amount in section 5.1 as available for <br />construction, the Engineer may be required at the discretion of the Owner to amend the <br />design to bring the construction cost estimate or bid amount within the amount specified <br />without additional cost to the Owner. . <br /> <br />5.1.1.3 If the work is not carried on after Construction Document Phase and <br />drawings, specifications and Construction Documents are completed and approved, the <br />Owner will pay the Engineer through the Construction Documents Phase in accordance <br />with Section 5.1.1 above; or, if the bids have been received, the Owner will pay the <br />Engineer eighty percent (80%) of the fee as specified in Section 5.1.1.1. <br /> <br />5.1.1.4 The ENGINEER'S responsibility to provide Basic Services for the <br />Construction Phase under this Agreement commences with the award of the Contract for <br />Construction and terminates sixty (60) days after a) the actual date of Substantial <br />Completion. Services provided after this date shall be considered Additional Services with <br />the compensation due in accordance with Subparagraph 5.1.2 of this Agreement and <br />shall require OWNER'S written authorization. <br /> <br />5.1.2 For Additional Services. Owner shall pay Engineer for Additional Services <br />rendered under Section 2 as follows: <br />