Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />completed or corrected. <br /> <br />c. Observe that all items on final list have been completed or <br />corrected and make recommendations to Engineer <br />concerning acceptance. <br /> <br />C. Limitations of Authority <br /> <br />Resident Project Representative: <br /> <br />1. Shall not authorize any deviation from the Contract Documents or <br />substitution of materials or equipment, unless authorized by Engineer. <br /> <br />2. Shall not exceed limitations of Engineer's authority as set forth in the <br />Agreement or the Contract Documents. <br /> <br />3. Shall not undertake any of the responsibilities of Contractor, subcontractors <br />or Contractor's superintendent. <br /> <br />4. Shall not advise on, issue directions relative to or assume control over any <br />aspect of the means, methods, techniques, sequences or procedures of <br />construction unless such advice or directions are specifically required by the <br />Contract Documents. <br /> <br />5. Shall not advise on, issue directions regarding, or assume control over <br />safety precautions and programs in connection with the Work. <br /> <br />6. Shall not accept Shop Drawing or sample submittals from anyone other <br />then Contractor. <br /> <br />7. Shall not authorize Owner to occupy the Project in whole or in part. <br /> <br />8. Shall not participate in specialized field or laboratory tests or inspections <br />conducted by others except as specifically authorized by Engineer. <br />