Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />EXHIBIT E <br />DESIGN CONCEPT MEMORANDUM <br /> <br />This is an exhibit made a part of and incorporated by reference into the Agreement <br />made on nAr.AmhAr Q. ?OO? between the City of La Porte (Owner) and Huitt- <br />Zollars, Inc. (Engineer) providing for professional services. <br /> <br />Engineer Supports & Install Prefabricated Steel Pedestrian Bridge over Little <br />Cedar Bayou Park <br /> <br />PROJECT OVERVIEW: <br /> <br />Engineer shall provide professional services to evaluate the proposed site and design structural <br />supports for installation of an Owner-provided 10' by 165' (nominal) single span (Steadfast) <br />prefabricated steel pedestrian bridge over Little Cedar Bayou at its intersection with South 3m <br />Street right of way. The City of La Porte, in conjunction with the Harris County Office of Housing <br />and Economic Development, will purchase and install a prefabricated steel bridge at the site <br />described above. Funding for this project is shared by Harris County and the City of La Porte. <br />The project includes the investigation of the site, utilization of the Bridge Engineer's plans and <br />specifications, evaluation of f100dway requirements, and other considerations to develop <br />footings and supports for the bridge. The selected firm will monitor construction of the footings <br />and supports, as well as the actual prefabricated bridge final assembly and installation. Time is <br />of the essence for this project. The prefabricated bridge must be installed and operational prior <br />to April 30, 2003. <br /> <br />ANTICIPATED PROFESSIONAL SERVICES: <br /> <br />The City intends to engage the services of a professional firm to develop the design of footings <br />and installation of the prefabricated bridge at the site. The anticipated scope of work will, at a <br />minimum, include the following: <br /> <br />. Evaluate Subsurface Conditions and other Factors Relating to Design - After review of <br />bridge engineered plans and specifications for loading, etc., Engineer shall investigate <br />through the use of soil samples, etc. to determine proper loading requirements to design <br />footings and supports for the bridge. Architect shall consider applicable utility siting for <br />the proposed design, including electrical and water components that may be on site. <br />Engineer shall consider special requirements for the site, located in City of La Porte right <br />of way, and assure that the resulting design meets all City, County and State <br />requirements, rules, and procedures required for design and installation. <br />. Develop Preliminary Design - Upon authorization, Engineer shall produce preliminary <br />design for the project for consideration by City/County Project Administrator review. <br />. Develop Final Design - Upon approval of the preliminary design, Engineer shall proceed <br />with final design details, including site requirements for piers and other considerations to <br />be determined. <br />