Laserfiche WebLink
<br />e <br /> <br />TABLE OF CONTENTS <br /> <br />TABLE OF CONTENTS <br />IDENTIFICATION OF THE PARTIESIPROJECT DESCRIPTION <br /> <br />SECTION 1 BASIC SERVICES OF Engineer <br />1.1 General <br />1.2 Schematic Design Phase <br />1.3 Design Development Phase <br />1.4 Construction Documents Phase <br />1.5 Bidding Phase <br />1.6 Construction Phase <br />1.7 Operational Phase <br /> <br />SECTION 2 ADDITIONAL SERVICES OF Engineer <br />2.1 Services Requiring Authorization <br />in Advance <br />2.2 Required Additional Services <br /> <br />SECTION 3 OWNER'S RESPONSIBILITIES <br /> <br />SECTION 4 PERIODS OF SERVICE <br /> <br />SECTION 5 PAYMENTS TO ENGINEER <br /> <br />SECTION 6 CONSTRUCTION COST AND OPINIONS OF COST <br />6.1 Construction Cost <br />6.2 Opinions of Cost <br /> <br />SECTION 7 GENERAL CONSIDERATIONS <br />7.1 Termination <br />7.2 Reuse of Documents <br />7.3 Insurance <br />7.4 Controlling Law <br />7.5 Successors and Assigns <br />7.6 Dispute Resolution <br /> <br />SECTION 8 SPECIAL PROVISIONS, EXHIBITS, AND SCHEDULES <br /> <br />Exhibit A <br /> <br />FURTHER DESCRIPTION OF Engineer BASIC <br />SERVICES AND RELATED MATTERS <br /> <br />Exhibit B <br /> <br />DUTIES, RESPONSIBILITIES AND <br />LIMITATIONS OF AUTHORITY OF <br />THE RESIDENT PROJECT REPRESENTATIVE. <br /> <br />Exhibit C <br /> <br />PROJECT COMMUNICATION <br /> <br />Exhibit D <br /> <br />INSURANCE <br /> <br />Exhibit E <br /> <br />DESIGN CONCEPT MEMORANDUM <br /> <br />e <br /> <br />Page(s) <br />1 <br /> <br />1 <br /> <br />1-1 through 1-8 <br /> <br />2-1 through 2-3 <br /> <br />3-1 through 3-3 <br />4-1 through 4-3 <br /> <br />5-1 through 5-3 <br /> <br />6-1 through 6-2 <br /> <br />7-1 through 7-3 <br /> <br />8-1 <br /> <br />A-1 through A-3 <br /> <br />B-1 through B-5 <br /> <br />C-1 through C-2 <br /> <br />0-1 <br /> <br />E-1 <br />