Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />2.1.2. Advise OWNER as to the necessity of OWNER's providing or obtaining from others data or <br />services which are not part of ENGINEER's Basic Services, and assist OWNER in obtaining such <br />data and services. <br /> <br />2.1.3. Identify and analyze requirements of governmental authorities having jurisdiction to approve the <br />portions of the Project specified by ENGINEER with whom consultation is to be undertaken in <br />connection with the Project. <br /> <br />2.1.4. Evaluate various alternate solutions available to OWNER as described in Exhibit A, and, after <br />consultation with OWNER, recommend to OWNER those solutions which in ENGINEER's <br />judgment best meet OWNER's requirements for the Project. <br /> <br />2.1.5. Prepare a report (the "Report'') which will contain the statement of OWNER's requirements for the <br />Project and, as appropriate, will contain schematic layouts, sketches and conceptual design criteria <br />with appropriate exhibits to indicate the considerations involved and those alternate solutions <br />available to OWNER which ENGINEER recommends. This report will be accompanied by <br />ENGINEER's opinion of Total Project Costs for each solution which is so recommended for the <br />Project, including the following: opinion of probable Construction Cost, allowances for <br />contingencies including costs of design professional and related services based on infonnation <br />furnished by OWNER "for allowances and other items and services included within the defmition of <br />Total Project Costs. <br /> <br />2.1.6. Furnish the Report to and review it with OWNER. ' <br /> <br />2.1.7. Revise the Report in response to OWNER's comments, as appropriate, and furnish final copies of <br />the Report in the number set forth in Exhibit A. <br /> <br />2.1.8. Submit the Report within the stipulated period indicated in Exhibit A. <br /> <br />2.1.9. ENGINEER's services under the Study and Report Phase will be considered complete at the earlier <br />of (I) the date when the Report has been accepted by OWNER or (2) thirty days after the date when <br />such Report is delivered to OWNER for fmal acceptance, plus in each case such additional time as <br />may be considered reasonable for obtaining approval of governmental authorities having jurisdiction <br />to review the portions of the Project specified by ENGINEER, if such approval is to be obtained <br />during the Study and Report Phase. <br /> <br />The duties and responsibilities of ENGINEER during the Study and Report Phase as set forth in this <br />paragraph 2.1' are amended and supplemented as indicated in Exhibit A. <br /> <br />ARTICLE 3 - SPECIAL SERVI<;:ES OF ENGINEER <br /> <br />3.1. Special Services Requirinl! Authorization in Advance <br /> <br />If authorized in writing by OWNER, ENGINEER shall furnish or obtain from others Special Services of the <br />types listed in paragraphs 3.1.1 through 3.1.9, inclusive, ,as amended and supplemented as indicated in <br />Exhibit A. These services are not included as part of Basic Services except to the extent otherwise p~ovided <br />in Exhibit A. These services will be paid for by OWNER as indicated in Section 6. <br /> <br />3.1.1 Preparation of applications and supporting documc:nts (in addition to those furnished under Basic <br />Services) for private or governmental grants, loans or advances in connection with the Project; <br />preparation or review of environmental assessments and impact statements; review and evaluation of <br />the effect on the design requirements of the Project of any such statements and documents prepared <br /> <br />Page 3 ofl0 <br /> <br />1/99 <br />