Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />FWS Agreement No: 1448-20181-00-G914 <br /> <br />IV. BACKGROUND <br /> <br />Little Cedar Bayou is a small tidal creek that empties into upper Galveston Bay and is subject to <br />erosion by wind driven waves and the wakes of ships utilizing the Houston Ship Channel. The <br />south shoreline of this bayou is eroding at a rate of approximately 2 feet per year with even <br />greater rates during extreme tide and heavy wave action caused by storms. The erosion is <br />causing the loss of mature hardwood trees in the City's Little Cedar Bayou Nature Park. The park <br />provides sanctuary for upland wildlife amidst a chiefly residential community. Additionally, the <br />woodlot in the Park provides stopover habitat for many migratory songbirds. The Park is utilized <br />by the public for birdwatching and fishing and nearby schools have used the area for educational <br />purposes. Previous attempts to stabilize the shoreline and establish intertidal marsh have failed <br />chiefly because they failed to adequately attenuate wave energy at the site. The City is proposing <br />to construct a breakwater, establish intertidal marsh and stabilize the shoreline to prevent further <br />loss of adjacent woodlot and improve fishery habitat at the site. <br /> <br />V. SCOPE <br /> <br />The City of La Porte is proposing to construct a wave energy barrier along the shoreline that would <br />stop the erosion, and prevent further loss of shoreline. The shoreline will be surveyed to meet <br />regulations enforced by the Texas General Land Office. After the survey is completed, and all <br />applicable permits have been obtained, work will commence on constructing the project. This <br />work will be performed by a local contractor and will done in a manner to minimize or avoid <br />impacts to the park lands. The project will involve the removal of debris and fallen trees from the <br />water and immediate shoreline, construction of a wave barrier, stabilization of adjacent bluff and <br />planting of Spartina alterniflora to create intertidal marsh. Specific plans of construction are <br />included in Attachment A. <br /> <br />A. The Service shall: <br /> <br />1. Provide funding in the amount of $10.000.00 for the coordination and implementation of <br />the project as described in Attachment A. <br /> <br />2. Provide technical assistance as needed for the successful completion of the project. <br /> <br />B. The City of La Porte shall: <br /> <br />1. ' Provide and acquire necessary surveys and permits for construction of the proposed <br />project. <br /> <br />2. Provide contract and construction oversight. <br /> <br />3. Execute and conduct the project as described in their proposal, Attachment A, <br />incorporated herein and made a part hereof. <br /> <br />C. Project performance will be measured by the successful stabilization of the shoreline through <br />construction of wave barrier and establishment of emergent vegetation and by a final report <br />submitted to the Service detailing effectiveness of shoreline protection and marsh restoration. <br /> <br />2 <br />