My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2436
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
O-2000-2436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:30:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />proceeding in accordance with the Contract Documents and ARCHITECT <br />shall keep OWNER informed of the progress of the work. <br /> <br />1.6.2.2 The Resident Project Representative (and assistants) may <br />be ARCHITECT's agent or employee and under ARCHITECT's supervision <br />or may be the OWNER's agent or employee and under OWNERS <br />supervision. The duties and responsibilities of the Resident <br />Project Representative (and assistants) are set forth in Exhibit B <br />"Duties, Responsibilities and Limitation of Authority of Resident <br />Project Representative". Any exceptions or modifications to these <br />responsibilities and limitations will be mutually agreed upon by <br />both parties in writing. <br /> <br />1.6.2.3 The purpose of ARCHITECT's visits to and representation <br />by the Resident Project Representative (and assistant, if any) at <br />the site will be to enable ARCHITECT to better carry out the duties <br />and responsibilities assigned to and undertaken by ARCHITECT during <br />the Construction Phase, ,and, in addition, by exercise of <br />ARCHITECT's efforts as an experienced and qualified design <br />professional, to provide for OWNER a greater degree of confidence <br />that the completed work of Contractor(s) will conform generally to <br />the Contract Documents and that the integrity of the design concept <br />as reflected in the Contract Documents has been implemented and <br />preserved by Contractor(s). On the other hand, ARCHITECT shall <br />not, during such visits or as a result of such observations of <br />Contractor(s)' work in progress, supervise, direct or have control <br />over Contractor(s)' work nor shall ARCHITECT have authority over or <br />Jresponsibility for the means, methods, techniques, sequences or <br />procedures of construction selected by Contractor (s), for safety <br />precautions and programs incident to the work of Contractor(s), for <br />safety precautions and programs incident to the work of <br />Contractor(s) or for any failure of Contractor(s) to comply with <br />laws, rules, regulations, ordinances, codes or orders applicable to <br />Contractor(s) furnishing and performing their work. <br /> <br />1.6.4Interpretations and Clarifications <br /> <br />ARCHITECT shall issue necessary interpretations and <br />clarifications of the Contract Documents and in connection <br />therewith prepare work directive changes; and after consultation <br />with owner, prepare change orders as required for owners review and <br />approval. <br /> <br />1.6.5Shop Drawings <br /> <br />ARCHITECT shall review and approve (or take other <br />appropriate action in respect of) Shop Drawings (as that term is <br /> <br />1 - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.