My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2436
LaPorte
>
.Ordinances
>
2000's
>
2000
>
O-2000-2436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:30:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />1. 6 .11 <br /> <br />Inspections <br /> <br />ARCHITECT shall conduct an inspection to determine if <br />the work is substantially complete and a final inspection to <br />determine if the completed work is acceptable so that ARCHITECT may <br />recommend, in writing, final payment to Contractor(s) and may give <br />written notice to OWNER and the Contractor (s) that the work is <br />acceptable (subject to any conditions therein expressed), but any <br />such recommendation and notice will be subject to the limitations <br />expressed in paragraph 1.6.9.2. <br /> <br />1.6.12 <br /> <br />Limitation of Responsibilities <br /> <br />ARCHITECT shall not be responsible for the acts or <br />omissions of any Contractor, or of any subcontractor or supplier, <br />or any of the Contractor(s) or subcontractor's or supplier's agents <br />or employees or any other persons (except ARCHITECT's own employees <br />and agents) at the site or otherwise furnishing or performing any <br />of the Contractor(s)' work; however, nothing contained in <br />paragraphs 1.6.1 through 1.6. 11 inclusive, shall be construed to <br />release ARCHITECT from liability for failure to properly perform <br />duties and responsibilities assumed by ARCHITECT in the Contract <br />Documents. <br /> <br />The duties and responsibilities of the ARCHITECT during <br />the Construction Phase are amended and supplemented as indicated in <br />Paragraph 6, Exhibit A "Further Description of Basic Services and <br />Related Matters". <br /> <br />1.7 Operational Phase <br /> <br />During the Operational Phase, ARCHITECT shall: <br /> <br />1.7.1Furnish the deliverable items referred to in <br />Section 1.6.10 and in the Operational Phase and present and review <br />them in person with OWNER. <br /> <br />1.7.2Define in Contract Documents the Contractor(s) (and or <br />Vendor(s)) responsibility in connection with the start up, <br />refining, and adjustment of any equipment or system. <br /> <br />1.7.3Define in Contract Documents the Contractor(s) (and or <br />Vendor(s)) responsibility for training owners staff to operate and <br />maintain any equipment or system and for reviewing pertinent <br />manuals, submittals, shop drawings, and warranties supplied by the <br />Contractor(s), Vendor(s), or Manufacturer(s) as the case may be. <br /> <br />1 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.