Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />obtaining such data and services. <br /> <br />1.3.4Based on the information contained in the Design Development <br />documents, submit a revised opinion of probable Total Project Costs <br />(as defined in paragraph 1.2.4) . <br /> <br />1.3.5Furnish five copies of the above Design Development documents <br />and present and review them in person with OWNER. <br /> <br />The duties and responsibilities of ARCHITECT during the <br />Design Development Phase are amended and supplemented as indicated <br />in paragraph 3 of Exhibit A "Further Description of Basic Services <br />and Related Matters". <br /> <br />1.4 Construction Documents Phase <br /> <br />After written authorization to proceed with the Final <br />Construction Documents Phase, ARCHITECT shall: <br /> <br />1.4.1Based on the approved Design Development Documents and any <br />further adjustments in the scope or quality of the PROJECT, in the <br />construction budget or in the total PROJECT budget authorized in <br />writing by the OWNER, the ARCHITECT shall prepare, for approval by <br />the OWNER, Construction Documents consisting of Drawings <br />(hereinafter called Drawings) and Specifications setting forth in <br />detail the requirements for the construction of the PROJECT by <br />Contractor(s). The specifications shall be pre~ared in conformance <br />~ith the sixteen-division format of the Construction Specifications <br />Institute. <br /> <br />1.4.2See that the Construction Documents include applicable <br />requirements/approvals of governmental authorities having <br />jurisdiction to approve the design of the project. Provide <br />technical criteria, written descriptions and design data ~or <br />OWNER's use in filing applications for permits with or obtaining <br />approvals of such governmental authorities as have jurisdiction to <br />approve the design of the Project, and assist OWNER in completing <br />permit application and in consultation with appropriate <br />authorities. <br /> <br />1.4.3Advise OWNER of any adjustments to the latest opinion of <br />probable Total Project Costs (as defined in paragraph 1.2.4) caused <br />by changes in general scope, extent or character or design <br />requirements of the Project or Construction Costs. Furnish to <br />OWNER a revised opinion of probable Total proj ect Costs based on <br />the Drawings and Specifications. <br /> <br />1 - 3 <br />