My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2000-2436
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2000
>
O-2000-2436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:05 PM
Creation date
7/27/2006 10:30:11 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
9/25/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />obtaining such data and services. <br /> <br />1.3.4Based on the information contained in the Design Development <br />documents, submit a revised opinion of probable Total Project Costs <br />(as defined in paragraph 1.2.4) . <br /> <br />1.3.5Furnish five copies of the above Design Development documents <br />and present and review them in person with OWNER. <br /> <br />The duties and responsibilities of ARCHITECT during the <br />Design Development Phase are amended and supplemented as indicated <br />in paragraph 3 of Exhibit A "Further Description of Basic Services <br />and Related Matters". <br /> <br />1.4 Construction Documents Phase <br /> <br />After written authorization to proceed with the Final <br />Construction Documents Phase, ARCHITECT shall: <br /> <br />1.4.1Based on the approved Design Development Documents and any <br />further adjustments in the scope or quality of the PROJECT, in the <br />construction budget or in the total PROJECT budget authorized in <br />writing by the OWNER, the ARCHITECT shall prepare, for approval by <br />the OWNER, Construction Documents consisting of Drawings <br />(hereinafter called Drawings) and Specifications setting forth in <br />detail the requirements for the construction of the PROJECT by <br />Contractor(s). The specifications shall be pre~ared in conformance <br />~ith the sixteen-division format of the Construction Specifications <br />Institute. <br /> <br />1.4.2See that the Construction Documents include applicable <br />requirements/approvals of governmental authorities having <br />jurisdiction to approve the design of the project. Provide <br />technical criteria, written descriptions and design data ~or <br />OWNER's use in filing applications for permits with or obtaining <br />approvals of such governmental authorities as have jurisdiction to <br />approve the design of the Project, and assist OWNER in completing <br />permit application and in consultation with appropriate <br />authorities. <br /> <br />1.4.3Advise OWNER of any adjustments to the latest opinion of <br />probable Total Project Costs (as defined in paragraph 1.2.4) caused <br />by changes in general scope, extent or character or design <br />requirements of the Project or Construction Costs. Furnish to <br />OWNER a revised opinion of probable Total proj ect Costs based on <br />the Drawings and Specifications. <br /> <br />1 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.