My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-2001-2468
LaPorte
>
Legislative records
>
GR1000-05 Ordinances - GR1000-05 Ordinances & Resolutions
>
2000's
>
2001
>
O-2001-2468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2016 3:39:06 PM
Creation date
7/27/2006 10:50:41 AM
Metadata
Fields
Template:
Legislative Records
Legislative Type
Ordinance
Date
2/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~ <br /> <br />e e <br />CLAUNCH & MILLER, INC. <br />Engineering Consultants <br /> <br />ATTACHMENT "A" <br /> <br />January 17, 2001 <br /> <br />Mr. Steve Gillett" <br />Director of Public Works <br />P.O. Box 1115 <br />La Porte, TX 77572-1115 <br /> <br />RE: Engineering Services for Design of Lift Station #40 <br /> <br />Dear Mr. Gillett: <br /> <br />Claunch & Miller, Inc. (CMI) is pleased to submit this proposal for providing engineering design <br />services on the above refereI).ced project. <br /> <br />DESCRIPTION OF PROTECT <br /> <br />CMI prepared a report, entitled "Lift Station #40 Evaluation" for the City of La Porte in December <br />of 1999. The report provides an evaluation of Lift Station #40 and the 10" and 12" force main <br />extending to the Gulf Coast Waste disposal Authority's (GCWDA) Bayport treatment plant. Lift <br />Station #40 is located near the southern limits of the City in the Shady River Subdivision. Future <br />development in the southern limits of the City is anticipated and the City desires to upgrade the <br />station tb serve additional developed areas.' The City also desires to rehabilitate the structural, <br />mechanical and electrical systems of the station and replace the existing suction lift pumps with <br />submersible type pumps. <br /> <br />The report recommended improvements to the lift station consisting of the removal of the existing <br />pumps and control system, cleaning and recoating the wet well walls and replacement of the control <br />system and pumps. The pumps will be replaced with submersible type pumps which will require <br />modifications to the wet well top and hatch opening. Existing flow to the wet well will have to be <br />bypassed during the construction of the proposed improvements. . <br /> <br />The preliminary estimated cost for the construction of the improvements was estimated to be <br />$196,400.00. <br /> <br />Page 1 of 5 <br /> <br />3701 Kirby Drive, Suite 860. Houston, Texas 77098. (713) 524-7113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.