Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />EXHIBIT A <br /> <br />FURTHER DESCRIPTION OF ENGINEERING <br />SERVICES AND RELATED MA TIERS <br /> <br />SCOPE OF SERVICES <br />FOR <br />CITY OF LA PORTE <br />LITTLE CEDAR BAYOU WASTEWATER TREATMENT PLANT <br />SLUDGE PROCESSING FACILITY IMPROVEMENlS <br /> <br />The Engineer will prepare a preliminary engineering report and provide additional services as <br />required for the Sludge Processing Facility Improvements at the Little Cedar Bayou Wastewater <br />Treatment Plant (WWTP). The work associated with these engineering services is separated <br />. into the following tasks: <br /> <br />I. Preliminary Engineering Services <br /> <br />II. Additional Services <br /> <br />R:\CONTRACf\LAPORTE\SCOPE-A.DOC say <br /> <br />A-l <br /> <br />January 4, 2001 <br />