Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Table A-3 <br /> <br />SUMMARY OF PRELIMINARY ENGINEERING COSTS <br />INCLUDING ESTIMATED COSTS FOR OUTSIDE PROFESSIONALS <br />SLUDGE PROCESSING FACILITY IMPROVEMENTS <br />LITILE CEDAR BAYOU WWTP <br /> <br />Preliminary En~eerin~ Phase <br />Preliminary Engineering (lump sum) <br />Surveying (reimbursable per Tables A-I, A-2) <br />Geotechnical (reimbursable per Tables A-I, A-2) <br /> <br />$ 76,500 <br />$ 15,000 (est.) <br />$ 20,000 (est.) <br /> <br />END OF ATTACHMENT A <br /> <br />R:\CONTRAcr\LAPORTE\SCOPE-A.DOC say <br /> <br />A-6 <br /> <br />January 4, 2001 <br />