Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Table A-3 <br /> <br />SUMMARY OF PRELIMINARY ENGINEERING COSTS <br />INCLUDING ESTIMATED COSTS FOR OUTSIDE PROFESSIONALS <br />SLUDGE PROCESSING FACILITY IMPROVEMENTS <br />LITILE CEDAR BAYOU WWTP <br /> <br />Preliminary En~eering Phase <br />Preliminary Engineering (lump sum) <br />Surveying (reimbursable per Tables A-l, A-2) <br />Geotechnical (reimbursable per Tables A-l, A-2) <br /> <br />$ 76,500 <br />$ 9,000 <br />$ 8,000 <br /> <br />END OF ATIACHMENT A <br /> <br />R:\CONTRACI'\LAPORTE\SCOPE-A.DOC say <br /> <br />A-6 <br /> <br />January 8, 2001 <br />