Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />. Type and amount of raw materials processed ( average and maximum per <br />day). <br />· Site plan, showing floor plan, mechanical and plumbing plans, and details to <br />sewers and appurtenances by size, location and elevation and all points of <br />discharge, <br />. Time and duration of the discharge. <br />· Plans and specifications of the grease, oil, and sand interceptors and control <br />location, <br />. Any other information as may deemed necessary by the Director to evaluate <br />the wastewater discharge permit application, <br /> <br />Incomplete or inaccurate applications will not be processed and will be returned to the <br />industrial user for revision, <br /> <br />4.6 Application Signatories and Certification <br /> <br />All wastewater discharge permit applications and industrial user reports must <br />contain the following certification statement and be signed by an authorized <br />representative of the user, <br /> <br />"I certify under penalty of law that this document and all attachments <br />were prepared under my direction or supervision in accordance with a system <br />designed to assure that qualified personnel properly gather and evaluate the <br />information submitted, Based on my inquiry of the person or persons who <br />manage the system, or those persons directly responsible for gathering the <br />information, the information submitted is to the best of my knowledge and belief, <br />true , accurate, and complete, I am aware that there are significant penalties for <br />submitting false information, including the possibility of fine and loss of services <br />for knowing violations," <br /> <br />4,7 Wastewater Discharge Permit Content <br /> <br />The Director will evaluate the data furnished by the industrial user and may <br />require additional information, Within ten ( 1 0 ) days of receipt of a complete <br />wastewater discharge permit application, the Director will determine whether or <br />not to issue a wastewater discharge permit. If no determination is made within <br />this time period, the application will be deemed denied, The Director may deny <br />any application for a wastewater discharge permit. <br /> <br />SECTION 5 WASTEWATER DISCHARGE PERMIT ISSUANCE PROCESS <br /> <br />5,1 Wastewater Discharge Permit Duration <br /> <br />Wastewater discharge permits shall be issued for a specified time period not to <br />exceed five (5) years. A wastewater discharge permit may be issued for a period <br />ofless than five (5) years, at the discretion of the Director, <br /> <br />17 <br />