Laserfiche WebLink
<br />e <br />II HaIff Associates <br /> <br />ENGINEERS · ARCHITECTS · SCIENTISTS <br />PLANNERS · SURVEYORS <br /> <br />e <br /> <br />system and programs, and will ,have three major components, which will be <br />synthesized to create a collectiye needs assessment. <br /> <br />· Needs based on recommended Recreation Standards <br />· Needs based on Citizen Input <br />· Needs based on Review of Existing System <br /> <br />Products - written summary of park system needs, in text, table and plan <br />format. Map illustrating key needs by sector. <br /> <br />Items Provided by City of La Porte- - review needs assessment and comment, <br />as appropriate. <br /> <br />PHASE II RECOVERY ACTION PLAN/PARKS AND <br />RECREATION MASTER PLAN <br /> <br />2.1 ANALYSIS OF AREAS FOR POTENTIAL PARKS <br /> <br />Evaluate city-owned sites for new parks, as well as sites located in the <br />undeveloped portions of La Porte to determine their s'uitability as future parks. <br /> <br />Develop criteria for new park development. The criteria may include: <br /> <br />· suitability for use as a park or open space; <br />· suitability for facilities which are most critically needed; <br />. potential for linkage with other parks. <br />. natural vegetation and ease of deve!opment; and <br />. potential acquisition and development cost. <br /> <br />Identify general areas with high value as potential future park or natural areas. <br /> <br />. Rank all sites or stretches of drainage ways for level of suitability. <br /> <br />Product - criteria for new candidate park and open space sites <br /> <br />Items Provided by City of La Porte- Review and comment; provide list of sites <br />previously considered as potential park sites. <br /> <br />2.2 PREPARE TRAIUGREENWAYS CONCi;PT PLAN <br /> <br />La Porte Parks Master Plan/Recovery Action Plan <br />Halff Associates Inc. March 14,2001 <br /> <br />Attachment 'A' - Scope of Work <br />Page 8 <br />