Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />Table A-3 <br /> <br />SUMMARY OF PRELIMINARY ENGINEERING COSTS <br />INCLUDING ESTIMATED COSTS FOR OUTSIDE PROFESSIONALS <br />SLUDGE PROCESSING FACILITY IMPROVEMENTS <br />LITTLE CEDAR BAYOU WWTP <br /> <br />Basic Services <br /> <br />Preliminary Engineering (lump sum) <br />.Final Design Phase (lump sum) <br />Desi~ Services During 'Construction (lump sum) <br /> <br />Additional Services <br /> <br />Preliminary Engineering Phase <br />Surveying , <br />Geotechnical <br /> <br />Final Design Phase <br />Surveying <br />Geotechnical <br /> <br />Construction Phase <br />Construction Materials Testing <br />, Resident Engineering <br />. Resident Engineering Support <br /> <br />. $ 76,500 (Complete) <br />,$ 186,983 <br />$ 49,001 <br /> <br />$ 9,000 (Complete) <br />$ 8,000 (Complete) <br /> <br />$ 3,000 <br />$ 15,000 <br /> <br />$ 30,000" <br />$ 112,000 <br />$ 12,370 <br /> <br />END OF EXHIBIT A <br /> <br />A-B <br />